343–345 Sansome Street
Financial District · San Francisco, CA 94104
Public art
- Four Seasons — Joan Brown
Tile; roof garden; artwork and open space are accessible from 9-5.
The tiled obelisk stands at the center of the 15th-floor roof terrace and was funded through San Francisco's 1% for Art program combined with the POPOS requirement. - L'Octagon — Pol Bury
Stainless steel, marble; Sacramento St. lobby; artwork and open space are accessible from 9-5.
Belgian sculptor Pol Bury (April 26, 1922 - September 28, 2005) began his career as a painter associated with the Jeune Peinture Belge and CoBrA groups before becoming known for kinetic sculpture.
Permit history
-
Nov 1981
Additions alterations or repairs.
-
Oct 1985
Vertical & horizontal extension.
-
Jan 1990
Const. of initial tenant improvements in 343 sansome street.
-
Dec 1995
Electrical, hvac, plumbing, drywall, spkinkler & finishes.
-
Mar 2005
Oti-1 4th floor el me ls sp.
-
Apr 2007
Oti-1 1st/fl-el, me, ls, sp.
-
Jul 2007
2nd floor-remodel of existingoffice floor: (n0) offices, conference rooms, copy rm, pantry and lounge. newlighting, power/data for offices, conference rooms, copy, pantry and lounge. mechanical and demolition under separate permit.
-
Mar 2009
Renovation of existing vacant office space/suite to include creation of private office, breakroom kitchen and ancillary support areas. mechanical/electrical, life safety sep permit.
-
Jul 2013
7th floor t.i. on the existing full floor tenant, demolition of partitions, doors, millwork, finishes, electrical, plumbing & ocnst of new partitoins, doors electrical, finishes & plumbing. mechanical, electrical, life safety & sprinkler system modifications under separate permit.
-
May 2014
Tenant improvement on an existing full 8th floor tenant. demolition few partitions, doors, finishes, electrical. construct new partitions, doors, electrical, finishes and plumbing. (mechanical, life safety and sprinkler system modification are under seperate permit.) n/a ordinance #155-13.
-
Sep 2015
14th floor, suite 1400: ti- demolition and construction of conference rooms and offices. new millwork at pantry and new finishes throughout. construction of 2 showers and 1 staircase. new ceiling and lighting.project is pursing leed gold. mep/fire/life safety under sep permit.maher na.
-
Jan 2016
Ste 125, change of use from office to fitness training. ti of existing space on 1st floor to include new partitions, lighting, re-assignment of existing electrical, counter, upgrade front entry and ada restrooms & shower. maher na.
-
Feb 2016
Interior ti demolition of non-load bearing partitions, ceiling grids, lighting and finishes, new partitions, ceilings, light fixtures, casework, doors and finishes. mep under separate permit. maher na.
-
Feb 2016
Meps for previously approved t.i. reference app#201602119388.
-
May 2016
Tenant improvment to existing levels 6 & 10th floors. spaces including new non load bearing partitions, suspended ceiling, floor finshes, restroom expansion, break room and storage.
-
May 2016
Interior ti: demolition of existing non load bearing partitions, ceiling grids, lighting and finishes. new construction includes interior partitions, ceilings, light fixtures, casework and installation of doors, compliance with 155-13 not required.
-
Jun 2017
5th fl, ste 500: demolition of non structural elements including interior partitions, doors, finishes, ceilings. new conferences, offices, phone rooms. mep, ls, sprinkler modification sep permit.
-
May 2019
10th floor - interior ti, new partition, lights, doors and finishes, ceilings. maher na.
-
Oct 2019
11th floor: office remodel of new conference rooms, huddle rooms, focus rooms, & break room, new furniture & finishes, upgrade all fixtures to new led lighting hvac upgrade for new remodel.
-
Aug 2022
Exterior: reconstruction & repairs of the southwest corner of the brick masonary on the facade. floors 3-5 of the corner are to be reinforced to prevent masonry cracking.floors 6-8 completel removed and replaced with new brick masonary & mortar.new steel shelf angles will be welded in place on 6-8/f.
-
Apr 2024
Office ti 9th floor to include soft demolition existing space to include non structural partitions, doors, ceilings, lighting millwork, fixtures and finishes. add new non structural partitions, doors, window glazing, ceieling, lighting millwork, fixtures and finishes. update bathrooms, elevator.
-
Oct 2024
15th floor: expand existing suite to adjacent suite. demolition of expansion suite includes non-structural partitions, doors, glazing, lighting fixture, millwork, and finishes. new construction includees new non structural partitions, doors, glazing, light fixtures millwork and finishes. mep deferre.
-
Dec 2024
16th floor: tenant improvement interior renovation to include non-structural partitions, new ceilings, and new finishes thoughout area of work. mep deferred.
-
Apr 2025
5th fl suite 500: demolition of existing non structural partitions, ceilings, doors, glazing millwork construction of new non structural partitions, ceilings, doors glazing. mep under separate permit.
-
Dec 2025
#950: new t.i. on 9th floor: includes demolition of existing office space: non structural partitions, doors, glazing, ceiling, lighting, millwork and finishes. mechanical, electrical, & plumbing submittals to be deferred.
DBI holds 473 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 473. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants, when each artwork was installed and who designed the open space. Submit an update