37.7921, −122.3996 A locator map appears here once a Mapbox token is configured.

98 Battery Street

Financial District · San Francisco, CA 94111

  • Built 1907
  • Office building
  • 7 stories
  • Zoned C3O
  • District 3
  • Historic status: historic resource
37.7921, −122.3996 Street View appears here once a Google Maps embed key is configured.
65,675 sq ftBuilding area
12,401.13 sq ftLot area
33Rooms · 12 baths

Permit history

  1. Sep 1983

    New construction.

    Withdrawn Permit 8309127S $$$ $15,600,000
  2. Jun 1988

    Office tenant improvements, electrical, finishes & partitions.

    Cancelled Permit 8807520 $$$ $150,000
  3. Jun 1990

    Ti.

    Expired Permit 9012719 $$$ $80,000
  4. Feb 2006

    Build 1-hr fire rated coridor tunnel/electric and mechanical on seperate permit.

    Complete Permit 200602215027 $$$ $108,000
  5. Feb 2006

    New drywall non bearing partitions, new suspended ceiling, doors, frames & finishes.

    Complete Permit 200602245360 $$$ $112,000
  6. May 2006

    New drywall, prtn, acoustic lay-in clg, doors, finishes. mechanical electrical sep permit and hvac.all non structural 4th floor.

    Complete Permit 200605040759 $$$ $92,000
  7. Oct 2008

    T.i. for verizon wireless, store remodel to change floor plan, mechanical, plumbing, electrical & framings. no structural work.

    Complete Permit 200810224781 $$$ $132,795
  8. Jun 2011

    2nd floor #250 -remove existing walls, door, light fixtures. install new walls, door, interior glazing. mep under separate permit.

    Complete Permit 201106137959 $$$ $50,000
  9. Nov 2012

    Interior remodel of existing convenience store. plumbing for coffee bar, beve rage bar, hand sink and toilets. new porcelain tile floor. new clg. grid and tiles throughout. new light fixutres. exterior signage shall be submitted for permit by sign vender.no exterior 0.

    Withdrawn Permit 201211083817 $$$ $125,000
  10. May 2013

    1st floor-tenant improvement to existing building space-1st floor of existing building. plumbing, mechanical, electrical & building. new floor, coffee & soda bar. new partitons, new restrooms, new cooler. new heating equipment for pre packaged food. no exterior work; separate permit for exterior signage.

    Complete Permit 201305076313 $$$ $315,000
  11. Nov 2014

    Install new 14'x26' equipment platform with equipment cabinets on roof top, install new screen wall 2 rru's pre-sector, 4 sectors total, (8) antennas total, install new 35 kw natural gas generator. n/a ordinance #155-13.

    Expired Permit 201411252538 $$$ $150,000
  12. Jul 2015

    Suite 202 (2/f): install new walls, doors, interior glazing & relocate/replace lighting fixtures, counter top & sink; maher n/a.

    Complete Permit 201507131326 $$$ $115,000
  13. Jan 2019

    #500 - remove existing partition walls, ceiling tiles and flooring. install new non structural walls, doors. side lights, power outlets, relocate existing lights install new finishes.

    Complete Permit 201901049678 $$$ $105,000
  14. Nov 2019

    #220: remove partition walls and construct new partition walls, doors, and sidelight. maher na.

    Complete Permit 201911207809 $$$ $120,000
  15. Dec 2019

    Proposed interior tenant improvement for restaurant.

    Complete Permit 201912119260 $$$ $200,000
  16. Dec 2019

    Mechanical for existing t.i. reference permit #201912119260.

    Complete Permit 201912300864 $$$ $100,000
  17. Sep 2020

    Reroofing-must comply with cool roofing requirements per 2019 ca 141.ob2b.

    Complete Permit 202009033348 $$$ $110,000
  18. Mar 2021

    Ste #500: revision to permit application 201901049678. remove demising wall from plan & saving exit doors. mep will be on seperate permit. upgrade existing restrooms to be accessible.

    Complete Permit 202103156534 $$$ $105,000
  19. May 2021

    3rd fl, ste 302 office ti. demolition breakroom ktichen and partial wall demolition at breakroom for new interior window. provide new countertops, cabinets and fixtures at breakroom. provide new finishes throughout. no exterior of site work.

    Complete Permit 202105190608 $$$ $122,475
  20. Jul 2021

    4th floor: hvac improvements.

    Complete Permit 202107144332 $$$ $195,000
  21. Feb 2022

    6/f: hvac improvements.

    Issued Permit 202202117801 $$$ $130,000
  22. Apr 2022

    2nd fl: air handler replacement.

    Complete Permit 202204283163 $$$ $145,000
  23. Jul 2022

    3/f: air handler replacement.

    Complete Permit 202207138328 $$$ $150,000
  24. Jul 2022

    5/floor - air handler replacement.

    Complete Permit 202207138330 $$$ $150,000

DBI holds 127 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 127. 4 of them are nominal $1 street-space or sidewalk permits.

Not yet documented: the architect and builder and the early tenants. Submit an update