101–111 Pine Street
Financial District · San Francisco, CA 94111
-
1963
Built.
-
1963
An office tower of 1963 by Mario Gaidano.
-
1965
The Barclays Bank Building was completed — nineteen storeys and 250 feet, with about 200,000 gross square feet of office space.
-
Oct 1981
Additions alterations or repairs.
-
Apr 1987
Lobby remodel including electrical, acoustical ceiling.
-
Dec 2000
Oti-1 4th floor el me ls sp.
-
Dec 2000
Oti-1, 8/floor el, me, ls, sp.
-
May 2002
Oti-1, 6th fl-el, me, ls, sp.
-
Jan 2005
Oti-1, 7th floor, el, me, ls, sp.
-
Mar 2008
Replace 2 existing water cooling towers on the 19th floor.
-
Mar 2009
Tenant improvement demolition e partitions, ceilings, finishes. construct new partitions, ceilings, finishes, construct new convenience stairs to e convenience stairs from 8th fl to 9th fl. fire alarm and sprinkler sep permit.
-
Aug 2010
Roof level-install new vrv supplemental cooling unit for floors 3rd through 8th, install heat recovery units on roof & ceiling fan co. units piping & controls.
-
Aug 2010
Office ti on the 11th floor. demolition partitions, ceiling, mechanical, electrical and slab to install new stairs. construct new partitions. mechanical, electrical. plumbing, new restrooms for ada.
-
Sep 2010
10th floor-demolition existing stairs that go to 11th floor. demolition bathrooms. construct new partitions, ceilings, finishes, bathrooms m, e, p lighting, doors and frames. fire alarm and sprinkler on seperate permit.
-
Mar 2011
New ti construction to include non structural partitions, finishes, ceilings etc on 32nd fl mechanical/el/sp/ls on separate permit.
-
May 2011
Revision to 200903254817/r2 9th fl: add stairs and partition typs from sheetrock to glass.new 9th floor opening for new spiral stairs to 8th floor.
-
Jun 2011
Demolition non structural partitions, doors, frames, ceilings, lights, finishes, construct new non structural partitions, ceiling lights, bathrooms, finishes, modify mechanical.
-
Jan 2013
13th floor-demolition non structural partition walls, doors, frames, partial ceiling grid, lights & finishes. construct new partitions, doors, frames, finishes, mechanical, ceiling to accomodate new layout. fire alarm, sprinkler on seperate permits. upgrade existing restrooms.
-
Apr 2014
15th floor - demolition existing non-structural partitions, doors, frames, ceilings, finishes, lights & construct new partitions, doors, frames, finishes modify, mep to accomodate new partition layout, sprinklers on separate permit. compliance with ordinance #155-13 not required.
-
Jun 2014
Tenant improvement (interior only) for an existing employee cafeteria, work includes replacement, add kitchen sinks, re-arrange of food service & seating areas and install of type ii hood. mep under seperate permit. n/a ordinance #155-13.
-
Jan 2017
6/f- demolition existing non-structural partitions, construct new non structural partitions, install new doors, millwork, carpet, paint, finishes, lights, accommodate mechanic for new wall layout. n/a ordinance #155-13.
-
Dec 2020
Demolition existing water-cooled chiller plants & towers and replace with new air-cooled chiller plant on the roof. new structural support on roof with distribution pumps and hydronic specialties on penthouse level.
-
Dec 2020
Demolition existing base-building centrifugal supply fans (x4) & replace with new fan wall technology with new vfd drive controller & power connections. new structural support for access platform for the fan wall.
-
Nov 2021
5/f: demolition non structural partitions, flooring, finishes construct new partions lightsmillwork finishes, relocated mechanical for new layout.
-
May 2022
Fire alarm - voluntary replacement of an existing simplex fire alarm panel with a notifier nfs2-3030 fire alarm panel. devices will be replace on a 1-for-1 basis. new 2-way emergency communication system is being installed.
-
Jul 2023
Replace electrical switch gear and electrical equipmemt on the tenant floors provide minor plumbing and mechanical alterations to support the electrical replacement, structural details provided for the electrical equipment. fire alarm/sprinklers under sep permits.
-
Feb 2024
Gr/f: tenant improvement for existing financial banker center. no additional area of height is part of the scope. scope is limited to interior only including but not limited to partial demolition of interior spaces, new finishes, new partitons and electrical.
-
Jun 2024
2nd floor: tenant improvement for existing financial banker center. no additional area of height is part of the scope. scope is limited to interior only including but not limited to partial demolition of interior spaces, new finishes, new partitons and electrical.
DBI holds 553 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 553. 4 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 100–102 Pine Street Same street
- 140–160 Pine Street Same street
- 98 Battery Street Same block
- 444 Market Street Same block
- 2–22 Battery Street Same block
- 388 Market Street Around the corner
- 235–259 California Street Around the corner
- 101 California Street Around the corner