201 California Street
Office building
-
1980
Built.
-
Apr 1980
Building use: office.
-
Nov 2000
Oti-1 1st floor eel, me, l/s, sp.
-
Oct 2007
Minor demolition. new partition to create private offices, break room, conference room, board room & storage. mep, fire sprinkler and life safety under separate permit.
-
Jul 2008
T.i. on 5th floor. demolition limited to ceiling and grid. all partitions, electrical data to remain. new millwork, carpet, paint, lighting fixtures, plumbing, hvac, fire, life safety upgrades as noted on mep drawings.
-
Sep 2008
6th floor-tenant improvement-4 spec suites, non-structural interior demolition, acoustic ceiling, drywall partitions, mill work, re-configure toilet partitions & finishes. structural deck patch. m.e.p, life safety, sprinklers on seperate permits.
-
Dec 2011
One unit: interior office t.i. demolition partition walls, finishes, new partion walls, ceiling, lighting finishes and furniture. upgrade restrooms.
-
Jun 2012
Tenant improvement on the ground floor, including demolition of existing offices, construction of a new showroom, finishes & furniture.
-
Apr 2014
14th floor: demolition incuding but not limited to demolition of existing partitions, finishes, mep. fire protection systems changes under separate application. build out new t.i. space with new mep and fire protection systems under separate appl. n/a for the maher ordinance #155-13.
-
Jun 2014
Demolition of existing non-load bearing partitions minor modification to ceiling grid light fixtures floor finishes. new construction interior partition, doors, glazing millwork and finishes, mep under separate permit; compliance with ord 155-13 not required.
-
Mar 2015
Floors: 10/11, 11 floor demolition under 201502178438; partial remodel of 0th & 11th floors existing wall, ceiling, lighting electrical & finishes. new non load bearing walls, doors ceiling etc.meps /ls & sprinklers under separate permit if needed (building fully sprinklered); maher n/a.
-
Aug 2015
Meps for 201503181201. 10th fl & 11th fl t.i. sheet a601 added to mep's for card reader compliance info. revisoin in this set to clarify elevator card reader.
-
Aug 2015
7th floor. demolition existing carpet & lights, construct new nonstructural partitions, new lights, outlets & mechanical & finishes. maher/na.
-
Mar 2016
In suite 1300: demolition of non-structural partitions, millwork, plumbing, power/signal, lighting & ceiling tiles. new non-structural interior partition, millwork, plumbing, doors/frames, ceiling/lighting & finishes. maher na.
-
Mar 2016
16th floor, scope of the project is a partial renovation of the existing 16th floor. the 16th floor is a single tenant floor. the scope consists of the construction of new partitions and minor adjustment of the existing mechanical, electrical and plumbing systems. mep & sprinkler under separate.
-
Feb 2017
5, 14, 15th floors: demolition of elevator lobby & restrooms finishes, ceiling grid & lighting fixtures. installation of new finishes & tenant doors/frames, construction portion of non structural interior wall, ceilings & upgrade restroom. maher na; deferred mep & electrical.
-
Mar 2017
Suite 500: this scope of this project is new interior partition, doors sidelights, door framing, millwork, break area, and finishes. there is no structural work associated with this scope of work. n/a for maher.
-
May 2017
15th fl a/mep t.i. - project include demolition of two (2) existing unisex restrooms and power/signal. new interior partitions for offices, glazing, doors/frames, lighting, power, millwork and sinks, there is no structural work associated with this scope of work. fire under separate permit n/a maher.
-
Dec 2017
4th & 6th floors - remodeling of men's women's restroom, replace existing corridor light fixtures, remodel existing elevator lobby, replace existing corridor light fixtures.
-
Dec 2018
Demolition non structural partions, ceilings, lights, finishes, doors, construct new partitions, lights, mechanical door, carpet finishes.
-
Feb 2021
Exterior work to demolition & construct ground level & level 2 storefronts and facade finishes. exterior lighting upgrade, sidewalks & new building signage. interior work includes replacement of non-structual partitions, doors, ceiling, millwork & lighting. mep deferred.
-
Sep 2024
Interior demoltion of 16/17 floor at 201 california. includes demolition of non-structural interior partitions, doors, mechanical/electrical outlets, switches, millwork, lighting, dropped ceiling, and flooring. per ab-017 occupancy/exiting to be address under separate permit. fire sprinkler permit application 20240919112.
-
Oct 2025
15/f suite 1500: architectural only. interior only office t.i. new partitions, offices, and finishes. mep deferred.
-
Jul 2026
Ste 1100 11/f: includes new construction of conf rooms, huddle, phone & break area. mep will be submitted as a separate permit. scope does not alter fixture quantities, occ load, calcs or path of travel.
-
Oct 2026
2/f suite 200: new construction of conference rooms, huddle, phone and breakarea of non-structural elements. doors, finishes, ceilings, lighting, mechanical, electrical outlets, switches. existing space is in shell condition. mep and fire safety deferred.
-
October 9, 2026
Ridge Capital Takes 272,000 SQFT 201 California in San Francisco From Columbia Property Trust for $75MM, Backed by $80.1MM Rialto Loan — The Registry
DBI holds 507 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 507. 4 of them are nominal $1 street-space or sidewalk permits. 1 cancelled permit is not shown.
Nearby
- 200–210 California Street Same street
- 212–214 California Street Same street
- 100–102 Pine Street Same block
- 235–259 California Street Same block
- 140–160 Pine Street Same block
- 101–111 Pine Street Around the corner
- 220–222 Battery Street Around the corner
- 222 Front Street Around the corner