235–259 California Street
Financial District · San Francisco, CA 94111
Permit history
-
Feb 1982
Additions alterations or repairs.
-
Apr 2001
Oti-1 5th floor me, l/s, sp.
-
Apr 2001
Tenant will occupy no change of use.
-
Jun 2009
Voluntary structural strenghtening existing central concrete shear core fl.2-8 & offset corner columns fl. 1-2. selective demolition & replace of existing portion walls & finishes near & around shear core &offset corner columns. accesib. upgrades on affected floors. frp-mep, life safety under separate permit.
-
Jan 2013
Tenant improement on 14th fl to construct new partitions, doors, millwork, glazing, finishes in vacant tenant space, mechanical, electrical plumbing included. sprinkerls and fire alarms separate permit. mnofr demolition to upgrade elevator lobby finishes.
-
May 2013
Floor 3. office t.i. - new partitions, finishes, lighting. mechanical and electrical under separate permit.
-
Oct 2014
T. i on the 12th floor. includes demolition of non structural partitions and lighting construction of new offices, project rooms, amenity spaces and open office as well as non structural walls, new doors including a one hour rated won door, framis, glazing and millwork. new electrical.
-
Apr 2015
Demolition of existing partitions, finishes and mep system (portion). tenant improvement of single floor including new wall, finishes, power and data outlets. new construction includes offices, conference, work room, break room and storage. n/a ordinance #155-13.
-
Feb 2017
10th fl. tenant improvement of single floor including new walls, finishes, power and data outlets. mep and fire life safety under separate permit. n/a maher ordinance.
-
Jan 2018
Ti of the existing space on ground level that includes non-structural partitions, doors, fixtures, finishes, electrical, mechanical, and plumbing. maher na.
-
May 2018
9th fl - work involves modification of existing tenant space to include construction of non-load bearing walls, new suspended ceiling grid & tile & new light fixts, doors & frames, new millwork & new finishes-new fire smoke damper-mep included. fire alarm and sprinklers sep. permit. n/a for maher.
-
Aug 2020
Replace existing partially accessible building entrance landing with a new accessible landing. new accessible steps, new accessible sloped walkway and new hand rails.
-
Oct 2020
5/f - t.i. new non structural partitions, offices, elevator lobby & corridor lighting & finishes. mep, fire, life safety & sprinkler under separated permit.
-
Nov 2020
4th floor. interior tenant improvement. upgrade of multi-use restroom, elevator lobby and suite 450. new fixtures and finishes. mep, fire life safety and sprinkler under seperate permit.
-
Aug 2021
Suite 1200: non-structural demolition. t.i. for construction of new partitions, doors and glazing. new millwork, new finishes throughout, ceiling and mep, including lighting, will be reworked as necessary to conform to revised partition layout. fire alarm/sprinklers under sep permits.
-
Aug 2021
Suite 1150: non-structural demolition. t.i. for construction of new partitions, doors and glazing. new millwork, new finishes throughout, ceiling and mep, including lighting, will be reworked as necessary to conform to revised partition layout. fire alarm/sprinklers under sep @003k%@aacfb.
-
Aug 2021
Interior renovation of the ground and 2nd fl lobby & 2nd fl common areas.
-
Apr 2022
2/f: landscape improvement exterior terrace. replace (1) exterior door with inswinging door to provide egress from south terrace.
-
Jun 2022
8th fl ste 800: interior t.i.. restroom and lobby upgrades. removel of non-structural partitions. new partitions, fixtures, and finishes. mep, fire, life safety, and sprinkler under separate permit.
-
Sep 2024
9th fl- ti 11, 1134 sq ft of total floor area. new walls, power, lighting & finishes.
-
Sep 2024
11th fl- ti 134 sq ft of total floor area. new walls, power, lighting & finishes.
-
Mar 2025
1/fl- alteration of interior buidling tenant amenities in vacant tenant spaces. new conferance center and change of use to a fitness center with new fitness equipment and associated all gender showers.
-
Dec 2025
Tenant improvement on the 7th fl. demolition of existing light fixtures, new demising walls, new interior partions, dropped ceiling, light power & finishes, mep include.
-
Apr 2026
Ground fl - commercial interior ti. remodel existing cafe space with new service counter, floor & ceiling treatments, finishes, equipment and limited partition changes. enlarge existing bathroom for barrier removal. no structural work. no changes to exterior envelope. mep included.
-
Aug 2026
Suite 1350. t.i. to include interior demolition. new demising walls, new interior partitions.
DBI holds 396 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 396. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. The city's Modern & Postmodern styles context statement dates this building 1959; the assessor's roll records it as built 1958. Submit an update