Permit history
-
Jul 1982
Building use: retail.
-
Aug 1982
Building use: com'l.
-
Nov 1986
Provide(2) two new glass storefront doors new glazed.
-
Feb 1987
Install restaurant fixtures & booths.
-
Jan 1990
T/i incl. partitions/walls, finishes, lighting.
-
Sep 1994
Comply with umb ordinance.
-
Nov 1994
Install 3 moment resisting steel frames-basemt to 2nd floor.
-
May 1995
Provide handicap entrance install atm machine.
-
Sep 1995
Install 2 handicap bathroomin basement, mechanical unit for ventila.
-
Apr 1997
To erect double faced electric sign.
-
Nov 1999
Demolition of non structural walls on 2/f const generator.
-
Jun 2000
Voluntary upgrade & strengthening, previous building retrofit-9418816.
-
Jul 2000
Revision on #9924181 revise struct detail.
-
Sep 2000
Install fm-200 suppression system in equipment rm/install panel.
-
Mar 2001
Demolition existing wet fire spsrinkler system in the bsmnt.
-
Oct 2001
Addendum to appl#9924181s, revise steel k. frame to concrete shear wall.
-
Nov 2001
Revision to app #9924181 & 200110120537.
-
Aug 2012
Upgrade entry door & door hardward. upgrade existing restrooms @ 1st fl. install new non-load bering partitions & new retail fixtures as required for new dispensary. (mcd).
-
Sep 2013
Add 2 addition offices and 2 new break rooms.
-
Jul 2014
Revision appl 201208308628. revise interior layout per plans. no change to building facade. maher n/a.
-
Dec 2014
Install new lighting for ti for medical cannabis dispensary. ref bpa#201407242082. compliance with maher ordinance no 155-13 not required.
-
Aug 2015
2nd floor: remodel existing office at 214 california street. add a restroom and conference room. ground floor under permit application 201503241772. maher n/a.
-
Apr 2016
Change of use from existing retail to a full restaurant, existing mechancial to be remain, kitchen hood and fire suppression system under seperate permit. none to block front window. n/a maher ord. 155-13.
-
Nov 2018
Remove floor, millwork, sink and 1 wall. install new finishes, furniture, lighting, millwork and kitchen equipment.
-
Aug 2026
2/f ti: demolish 12 offices to make open office area. reconfigure break room area. install 1 urinal in bathroom. install sun tunnels in roof.
DBI holds 82 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 82. 6 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update