Feb 1985
Sign - erect.
-
Apr 1998
Erect a 9 story office/retail/parking structure.
-
Mar 2000
Retail space first time tenant build out.
-
Jan 2001
Oti-1 3rd floor, electrical, mechanical, sprinkler, lifesafty.
-
Jan 2001
Oti-1 4th floor mehcanical, lifesafty, electrical, sprinkler.
-
Jan 2001
Oti-1 4th fl/ electrical, mechanical.
-
Jan 2001
Oti-2 3/f el me oti1 = 200101109528.
-
Jan 2001
Oti-1 6th floor, el, me, l/s & sp.
-
Jan 2001
Oti-1 5th floor, el, me, l/s & sp.
-
Feb 2001
Oti-2 6th floor, ltg. mechanical.
-
Feb 2001
Oti-2 5th floor ltg, mechanical.
-
Mar 2001
Oti-1, 8th floor, el, me, ls, sp.
-
Mar 2001
Oti-1, 7th floor, el, me, l/s & sp.
-
Mar 2001
Oti-2, 7th fl, ltg mechanical.
-
Mar 2001
Oti-2 8th floor ms el.
-
Mar 2001
Fire sprinkler work calculated on floors 8, 7, 6, 5, 4, 3, gr floor.
-
Apr 2001
Lobby finishes and minor construction on the ground fl including mechanical/electrical. new building. 1st time.
-
Apr 2003
Install new vav zones & re-balance floors 3, 4 & 5. volume of air to each floor to remain unchanged.
-
Apr 2003
Minor alterations to roof ferrace under previousing approved app#9807375s.
-
Jul 2010
4th, 6th & 7th floors-demolition of existing non structural walls, millwork, ceiling & finishes. new non struct walls, millwork, ceiling & finishes. no change in occupancy, use or square feet. m.e.p, sprklers, fire alarm under seperate permit. note: there is a change of use on 7th floor only from b to b, a2.
-
Aug 2010
Floor 4, 6, 7 -mechanical and electrical. design build drawings for 201007025862. provide lighting in new offices. adjust existing havac to accomodate new layout- 2 fsd's relocated- fire alarm and sprinklers separate permits.
-
Mar 2011
Removal of e 1 hr photo, update ceiling and soffit. addition of refrigeration case, new beverage center, new checkout, cosmetic, pharmacy and employee room. new finish throughout. perform work to comply with complaint 201073301. refer by sffd.
-
Dec 2011
Replacement of boiler like for like.
-
Jan 2020
Replace existing bms (building management system) controls with new revised controllers and software smoke controls upgrade. ref permit application 201802141220.
-
Sep 2022
5th fl: ab 017: interior demolition of non-structural elements including interior partitions, doors, finishes, electrical outlets and switches. space shall remain unoccupied until future tenant build out. per ab017 t.i. mep & life safety modification under seperate future permit.
DBI holds 74 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 74. 1 of them are nominal $1 street-space or sidewalk permits.