150 California Street
Financial District · San Francisco, CA 94111
Public art
- Arbor Arch — Ed Carpenter
Aluminum pipe, stainless steel cables and hardware, aluminum channel, dichroic glass; rooftop terrace of the sixth floor; artwork available from 9:00 a.m to 6:00 p.m.
Installed 2000. The sculpture, measuring 54 by 28 by 19 feet, was commissioned to disguise a large air vent and diesel exhaust stack emerging into the sixth-floor roof garden while adding to the garden's ambience.
Permit history
-
Apr 1983
Misc.
-
Jun 1990
Erect a 25 story office/retail/parking structure.
-
Mar 2000
Oti el, me, ls, sp, at 3rd floor.
-
May 2000
Oti-1 20th floor el, me, sp, l/s.
-
Nov 2000
Oti-1 21st floor el me l/s sp.
-
Nov 2000
Oti-1 12th floor, ltg, mechanical, ls, spr.
-
Nov 2000
Oti-1 13th floor ltg. mechanical, l, s spr.
-
Jun 2009
10th floor-alteration & construction of non-bearing partitions, new ceiling grid & tiles to align with existing, relocate light fixtures, new office doors & sidelights, new millwork, new finishes. restroom accessiblity upgrades on 10th fl. mechanical, electrical work to be done under seperate permit.
-
Dec 2011
Project improvement involves modifications to suite 400 on the 4th floor at 150 california st, new partitions, doors, frames, glazing, casework, lighting, mechanical, electrical, plumbing, and finishes.
-
Jan 2015
Ti 12th and 13th floor: this includes new drywall partitions, finishes and mep. n/a for maher. sprinklers and fire alarm separate permits.
-
Aug 2016
Interior impr. demolition existing non-load bearing partitions, clg grids & tiles lighting & finishes. nw const. includes nw interior partitions, cldg & lighting fixtures, casework & nw doors & finishes. fire life safety, fire sprinkler & mep eng are deferred submittals. no exterior work, hazmat, &.
-
Mar 2018
Partial remodel interior load bearing ptns, finishes, doors, reconstruct interior non bearing partitions, doors, finishes. relocated lighting, restroom upgrades, no ext work. no struct work. no hazardous matter. all mechanical/ele/life safety engineering fire sprinkler work are derfeered to design build.
-
Apr 2018
Scope of project is remodel of e office space at 150 calif 4th fl demolition and new non struc int walls, pwr/data, minor lightng, divide e idf rm into 1 n storage, 1 small idf rm, 1 e conv into 1 new office 1 conferende, 1 new phone, 1 new wllnes rm upgrd restrooms.
-
Nov 2018
Ti on 2nd floor-non struct demolition. new non struc partitions, doors, glazing, ceiling, lights, millwork, finishes. no change in area, occup or use. mep/fire/life safety under sep permit maher na.
-
Oct 2020
7th floor. interior tenant improvement. demolition fo restroom & elevator lobby. constructin of non-structural partitions, ceilings, casework & finishes. no change in occupancy use or area. mep, life safety & sprinklers are under serparate permit.
-
Oct 2020
Interior t.i. including non-structural demolition and construction of new non-structural partitons, glazing, ceilings, lighting, millwork, and finishes. no change in occupancy, area or use, mep & life safety under sep. permit n/a maher.
-
Jun 2021
3rd fl: interior tenant improvement including demolition and construction of partitions, doors, ceilings, lighting, millwork and finishes, no structural, no change in area or occupancy, mep and fire, life safety is deferred.
-
Jun 2021
10/f: interior t.i. including demolition and construction of partitions, doors, ceilings, lighting millwork and finishes. no changes in occupancy, use, or area. mep is deffered.
-
Sep 2021
2nd fl ste 200: existing tenant space. modifying existing partitions, doors, ceilings, and finishes, as well as lighting, power and mechanical systems.
-
Oct 2022
20th fl tenent improvement including new rooms, elevator lobby, reception, conference rooms, amenity space, mep, fixtures, finishes & equipment, and offices.
-
Dec 2022
11/floor (suites 1100, 1125 & 1150): ti including demolition & construction of partitions, doors, ceilings, lighting, millwork, retrooms and finishes.
-
Jul 2023
Fire alarm system voluntary replace one to one with notifier nfs2-3030. adding 2-way communication system.
-
Aug 2024
23rd/f: demolition of non-structural interior partitions & new contruction of interior partitions, break room millwork, mep & lighting. no structural work inclued in scope, no imcrease in area. no change in occupancy or use.
-
Jan 2025
8/fl-interior ti altering 2 suites into 3 suites. work includes demolition and construct of partitions, doors, ceilings, lighting and finishes. mep deferred.
-
Feb 2026
17/f: minor t.i. to make market ready: no occupancy at completion. future t.i. sep permit. renovations/upgrades toexisting restrooms.
DBI holds 449 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 449. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants and who designed the open space. Submit an update