Permit history
-
Feb 1979
New construction.
-
Apr 1982
Building use: offices.
-
Feb 1983
Additions alterations or repairs.
-
Jun 2017
41st fl tenant improvement of existing office space. maher ord 155-13 na.
-
Jul 2019
22 fl. non structural intertior t.i. partitions, finishes, casework, mechanical, & electrical, plumbing to tie into existing building utilites.
-
Jul 2019
23rd fl. non structural intertior t.i. partitions, finishes, casework, mechanical, & electrical, plumbing to tie into existing building utilites.
-
Jun 2020
Improvements to the exterior plaza & interior spaces. exterior renovation: newlandscaping, water features, fixtures, kiosk, paving, cladding around mechanical vents, etc. lobby improvements: interior finishes in elevator entries, lighting & flooring, staircase, fitness room & engineering workshop.
-
Jan 2021
36/f: renovation of existing office space t.i. construction of non-load bearing partitions, mep & communication. celing systems with new lighting, floor, paint and finishes. maher n/a.
-
Jan 2021
32/f: renovation of existing office space t.i. construction of non-load bearing partitions, mep & communicatioin celing systems with new lighting, floor, paint and finishes.
-
Jun 2021
Modifications to the level 8 roof of the podium portion of 101 california. scope includes the extension of two egress stairs to the roof, a new 2-stop elevator to connect l7 and l8, and a new waterproofing layer.
-
Sep 2021
3rd floor: mep and fire life safety under seperate permit. t.i. in podium of existing 48 story office building. inprovements to include minor demolition, open office, conference rooms, break areas and support area. finishing of kitchen for food prepared off site.
-
Sep 2021
Tenant improvement on the 5th fl to include minor demolition, construction of open office, conference rooms, break areas, and support spaces.
-
Aug 2022
7/f: t.i. to include minor demolition & building new partitions to create open office conference rooms, break areas and uspport space. mep under sep permit. maher n/a.
-
May 2024
26th: renovation of full floor existing b occupancy space proposed tenant improvement work includes demolition of interior non structural partitions, ceilings, lighting & finishes. construction of new non load bearing partitions, mechanical, plumb, electrical and communciation, ceiling systems with new lighting, flooring.
-
Jun 2024
21st fl full floor ti mep upgrades included.
-
Jul 2024
17/fl- full office ti to include new non loading bearing partitions, doors, frames, and hardware. ceilings, lighting and controls, millwork finishes and mep.
-
Aug 2024
18th floor: full floor office t.i. including new non-load bearing partitions; doors, frames, & hardware; ceilings, lighting, & controls; millwork; finishes; & mep. project also includes minor structural upgrades to support an operable partition(sliding, stacking type).
-
May 2025
35th fl - interior office ti. new non load bearing partitions, ceilings, doors & finishes. mep deferred.
-
May 2025
34th ti new non-structural partitions, lighting, ceiling, finishes, mep; mep structural deferred.
-
Nov 2025
13/f: tenant fit out of 13th floor. non structural demolition. new partitions, ceilings, doors, equipment and finishes. mep.
-
Nov 2025
43rd floor. partial non-structural demolition and new tenant fit out of 43rd floor, including new partitions, ceilings, doors, equipment and finishes. new mep (selective areas of mechanical to remain).
-
Dec 2025
14th fl - partial non-structural demolition and new tenant fit out of the 14th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep.
-
Dec 2025
12th fl: non-structural demolition and new tenant fit out of the 12th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep. create new opening in e) 13th/f slab, ancharage design for aperable partition units attached below e) 13th/f slab. no exterior work.
-
Dec 2025
11th floor - partial non-structural demolition and new tenant fit out of the 11th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep.
DBI holds 2,086 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 2,086. 12 of them are nominal $1 street-space or sidewalk permits.
1 July 1993
A gunman entered the 34th-floor offices of the law firm Pettit & Martin and killed eight people and wounded six before killing himself. The killings were among the events that carried the federal Violent Crime Control and Law Enforcement Act of 1994 to passage.
Not yet documented: the developer and the early tenants. The assessor records 1983 (on file), but Wikipedia and the SPUR POPOS guide both record 1982 as the completion/plaza year. Submit an update