Jun 1982
Additions alterations or repairs.
-
Jul 1984
Tenant improvement.
-
Jan 1999
Remodel building lobby and exterior plaza.
-
Mar 2013
5th floor full floor tenant improvement including minor demolition, new non-structural partitions, new finishes & millwork & associated mechanical & electrical. l.s. & sprinklers under separate permit.
-
Jul 2013
10th floor: demolition of non-structural partitions, ceilings, construct new non-structural partitions, new ceilings, and finishes. mep, life safety, sprinkler to be done under sep permit.
-
Jun 2015
T.i. on 4/f to construct new partitions, doors, millwork and finishes. mep., life safety and sprinklers will be submitted seperately. n/a ordinance #155-133.
-
Jun 2015
T.i. on 8/f to construct new partitions, doors, millwork and finishes. mep., life safety and sprinklers will be submitted separately. n/a ordinance #155-133.
-
Jul 2015
Electrical and lighting title 24 to upgrade equipment and fixtures on 4th and 8th floor. t.i. 's please refer to app#201506158990 for the 4th floor and 201505168994 for the 8th floor. n/a for the maher.
-
Feb 2016
Renovate existing 14th floor, including expansion onto mechanical roof wall, from a mechanical/maintenance space into a cold shell for leasing; move all mechanical/electrical/plumbing systems from 14 to 15th/roof penthouse. plumbing & electrical are under separate permit. n/a for maher ordinance no 155-13.
-
Mar 2016
12th floor: project is to renovate the interior of full floor 12 of an existing 15 story building. no exterior wall is included in the scope. full project is approx. 19, 079 sq ft. provide new of conference rooms, accessory and pantries.
-
Apr 2016
Partial 11th floor tenant improvement: renovate the interior of an existing 15 story building. no exterior work full project is approx. 9256 sq ft includes demolition of existing tenant fit out and to provide new offices and etc. n/a for maher.
-
Oct 2016
14th floor: new curtain wall at all four elevations. this refers to ref permit application 201602129534.
-
Dec 2016
Revision to 201602129534. new non combustible private roof deck with pedestal pavers, glass and metal reailings. structural improvement atthe undersid of roof slab, new steel interior stair, elevator from 14th fl. new elevator machine room 13th fl. electrical/plumbing stubouts. 4250 sq ft area.
-
Dec 2016
Basement: change out 2 chillers and 3 boilers 1-hx ada new pumps maher na.
-
Jan 2017
Ste 700: interior tenant improvement on partial floor to include new non-structural partitions & finishes throughtou mep & fire life safety under separate permit.
-
Jan 2018
14th floor - ti new partitions, conference and office space. mep deferred maher na.
-
Jan 2018
13th fl: ti to include new partitions, conference rooms & office space. mep deferred. maher na.
-
Aug 2022
12th fl: partial demolition of existing tenant fit-out and to provide new offices and conference rooms. mep included.
-
Jun 2024
14th fl: ti includes the demolition of non structural partitions and building new non structural partitions. meps included. all new or revised life safety/fire alarms & sprinklers will be design build and submitted separately. (building is fully sprinklered).
-
Jun 2024
13th fl: ti includes the demolition of non structural partitions and building new non structural partitions. meps included. all new or revised life safety/fire alarms & sprinklers will be design build and submitted separately. (building is fully sprinklered).
-
Apr 2025
Alterations to the two-story facade fronting the plaza & remedial waterproofing of the existing planter. installation of curtain wall, all work within the property line, no alteration or impact to the public right of way.
-
Jul 2025
10th fl: demolition of some existing ceiling height partitions. construction of new full ht partitions, doors, glazing & finishes. associated electrical power/lighting distribution. mep deferred. associated life safety system charges.
-
Sep 2025
Basement: remodel of existing amenity gym. new non-structural partitions, lighting, power, millwork and finishes.
-
Dec 2025
10th fl: partial floor tenant improvement. demolition and construction of offices. conference rooms, restrooms, break room. structural and mep included.
-
Dec 2025
1st floor: new fidelity investment center. new partitions and office, new ducts, power, & lighting.
DBI holds 716 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 716. 18 of them are nominal $1 street-space or sidewalk permits.
Bethlehem Steel's Pacific Coast headquarters
The structural columns stand outside the perimeter walls — a choice informed by the seismic research of the day, and one that put the client's product on show. The American Institute of Steel Construction gave the building an Architectural Award of Excellence in 1961.
Not yet documented: the developer, the early tenants and who designed the open space. Submit an update