50–52 California Street
Financial District · San Francisco, CA 94111
Permit history
-
Nov 1981
Additions alterations or repairs.
-
Apr 1996
Renovate existing plaza finishes planter & drainage remove existingpav.
-
Feb 2002
Lobby, arch build back, mechanical & structural.
-
Feb 2009
At 24th fl: t.i. improvement including minor demolition, construction ceiling, lightly, power & signal furnishes.
-
Apr 2014
31st floor: selective demolition of elevator lobby "s" doors. construction of non-structural partitions. glazing, doors, frames, hardware, new ceiling, lights/fixtures and new finishes throughout. lifie safty, and fire sprinkler under seperate permit. n/a for the maher ordinance #155-13.
-
Jan 2015
32nd floor - remove hazardous material from current unoccupied space full floor and includes demolition of non-sturctural partitions, power/data, millwork, plumbing and ceiling. new work consists of restroom build back and elevator enclosure. space remain unoccupied. t.i.under sep. permit.maher n/a.
-
Apr 2015
3rd floor: t.i. includes new partitions, doors, ceilings, lights, finishes and associated mep. life safety under separate permit. maher n/a.
-
Apr 2015
2nd floor: t.i. includes new partitions, doors, ceilings, lights, finishes and associated mep, life safety under separate permit. maher n/a.
-
Jun 2015
32nd fl: partitions, new non-structural ceiling, lights, electrical, finshes, millwork, mep. no change in area, occupancy or use or use. maher not req. deferred submittals - stuctural for roll-up door and sliding glass doors and for life safety.
-
Nov 2015
Demolition of 10/f existing walls, ceiling, lighting, electrical and finishes. new non-load bearing walls, restrooms, doors, ceiling, lighting, electrical, finish and furnishing. n/a ordinance #155-13.
-
Jun 2017
19th floor - construction of new non-load bearing partitions. new acoustical grid & tile and gyp board ceiling in select areas. new finishes throughout. mep under separate permit.
-
May 2018
Interior tenant renovation of 18th fl. lobby, open office and comf. rms. including new partitions, finishes & lighting, mechanical, electrical, plumbing and fire protection.
-
Jul 2020
33rd floor only. construction includes new partitions, finishes, lighting, and equipment.
-
Dec 2020
Existing office tenant improvement to 12th floor. interior demolition under permit application 202010196863.
-
Apr 2022
23rd fl: t.i. work includes non-structural renovations of partitions, flooring, ceilings, doors, fixtures, and finishes. mep deferred.
-
Sep 2022
T.i. non structural partitions, doors, ceiling, lights, millwork, and finishes.
-
Jan 2023
21/f: tenant improvement. new offices, reception, conference room, open work stations, new partitions - non load bearing, storefronts, ceilings, millwork, furniture, power/data and mechanical, electrical, and plumbing work. no structural work.
-
Mar 2023
13th fl - ti consisting of new non-structural partitions, doors, ceiling, lights, millwork, finishes, electrical, plumbing and hvac.
-
Apr 2023
21/f ste# 2150 spec suite: tenant improvement, new non-structural paritions, doors, ceilings, millwork, hvac, plumbing, electrical, finishes and light fixtures.
-
Mar 2024
31/f: demolition of non-structural partitions, millwork, finishes, ceiling, lighting and plumbing. construction of non-structural partitions, millwork, finishes, ceiling, light, new demising partitions and non-rated common corridor. no change in occupancy, use or area.
-
May 2024
36th fl: office ti installation of new finishes, floors & walls. mep deffered on separate application.
-
Jun 2024
35th fl. office t.i. includes installation of new finishes, floors, walls mep deffered on spearate application.
-
Sep 2024
24th fl - dmo of non-structural partitions, millwork, finishes, ceiling, lighting and plumbing. construction of non-structural partitions, millwork, finishes, ceiling, lights and new partitions. no change in occupancy use or area.
-
Oct 2025
28th floor ti: partitions, doors, ceilings, fixtures & finishes, mep.
-
Apr 2026
2/fl- ti to include non structrual demolition and construction of new conference center, gym, and lounge.
DBI holds 1,224 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 1,224. 10 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early tenants, who designed the open space and the date of the last recorded sale. The assessor records 1971; Wikipedia records completion in 1972. Submit an update