20–26 California Street
Financial District · San Francisco, CA 94111
-
1908
A downtown commercial building. The city's survey names it the Marine Building, though its scan of the name is imperfect.
-
Sep 1984
General commercial construction/paint walls ground level.
-
Aug 1988
Seismic upgrade only.
-
Aug 1988
Horizontal addition.
-
Jul 1989
Cti1.
-
Oct 1989
Tenant improvements.
-
Jan 1990
T/i including new partitions and suspended scoustical ceilng.
-
May 1990
Cti1.
-
Jun 1990
T/i partitions, finishes electrical & minor plumbing work.
-
Oct 1990
Office tenant improvements.
-
Nov 1990
T/i include new partitions & finishes comprising 1 floor.
-
Jan 1992
Alteration of existing walls & space.
-
Aug 2003
Tenant improvement including minor exterior alterations, new kitchen & prep area, accessible restrms.
-
Sep 2003
Provide mechanical, electrical, and plumbing for tenant improvement, fire supression=separate permit.
-
Aug 2004
Install (12) 4' panel antennas on roof of penthouse & bldng. exterior.
-
Mar 2011
Renovation of an existing concentra clinic, remove some smaller partition rooms to allow for an physical therapy area.
-
Jan 2013
Basement: this project involves modification and expansion of existing restrooms, shower rooms, and t.i. space to include construction of non-load bearing partitions, partial new gyp bd ceiling, new light fixtures, new doors and frames, new plmg fixtures/new finishes.
-
Feb 2013
2nd floor: this project involves modification of an existing t.i. space to include selective demolition & construction of non-loading bearing partitions, new gypsum ceiling nw light fixtures, nw interior doors, glazing, frames, nw electrical, millwork and new finishes.mep, sprinkler & fire alarm defrd sbmt.
-
Jun 2013
The project involve modification to existing t.i space to include selective demolition & construction of non load bearing partitions, new gypsum ceiling fire protection, new light fixtures, new interior doors, hardware, glazing & frames, new electrical, millworks & new finishes.
-
Jun 2014
6th floor: project involves minor modification of existing tenant improvement space to include selectrive construction of non-load bearing partitions, selective relocation of existing light fixtures, new interior doors, hardware, glazing & frames & electrical; maher n/a.
-
Jun 2014
Modification of existing tenant improvement to include construction of non-bearing partitions, light fixtures relocation and new including re-switching, new office doors & frames, new millworks, new smoke/draft rou down doors at elevators & new finishes. n/a for maher.
-
Jan 2016
This ti project involves modification to existing full floor tenant suite, to inlcude selective demolition & construction of non-load bearing partitions, new gypsum fire protection, new light fixtures, new interior doors & frames, new electrical, new millwork & new finishes. maher na.
-
Oct 2017
5/f -add restroom; restrooms upgrades - including demolition reinstall existing door in conference room and new partition.
-
May 2019
Floors 3 & f: modification of existing ti to include construction non-load bearing partitions, light fixture relocation and new including reawitching, new office doors and frames, new millwork, new smk/draft roll down doors at elevator and new finishes. maher n/a.
-
Apr 2022
Verizon wireless: replace 9 & add 2 antennas. replace 6 rrus. replace 6 ovps. remove rooftop doghouse & install 4 frp radomes, antenna mounting frame, antenna mount. replace section of cable tray, reroute coax & hybrid cables. at equip room, remove 3 rrus & replace 3 ovps.
DBI holds 104 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 104. 10 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. Submit an update