425 Bush Street
Financial District · San Francisco, CA 94108
-
1908
Built.
-
1947
Jack Hillmer's only known San Francisco work: the interior of his own office, fitted out in 1947.
-
Aug 1983
Construct meter antenna.
-
Nov 1987
New replacement windows in existing exterior openings.
-
Nov 1987
Install an automatic fire spk system for shell condition.
-
Apr 1988
Structural only-voluntary seismic upgrade.
-
Apr 1988
Ti, demising walls, store front, stair, finishes @ grd floor.
-
Jun 1988
Tenant improvements for hair salon, non rated interior walls.
-
Jun 1988
Partial voluntary seismic upgrade, re #8804472.
-
Nov 1993
Renovate existing retail space by adding wall & furnish equi.
-
Jun 1995
Bolts purs irregularities corrected siesmic upgrade building.
-
Mar 1999
Oti-1 el me ls sp 5th floor.
-
Feb 2000
Provide new store front, interior finihes, upgrade lobby.
-
Apr 2000
Oti-1, 3rd floor, el, me.
-
Jul 2000
Oti-2: el, 3rd fl.
-
Jan 2001
Interior ti including inter partitions suspnded ceiling rstrms, casework, finishes light/mechanical separat.
-
Jul 2001
Work includes, ada barier removal, demolition of first floor restrooms and walls in second floor placement.
-
Jan 2002
Oti-2 - 2nd floor ltg, mechanical.
-
Apr 2002
Oti-2, 2nd floor- el.
-
Jun 2007
Third floor sutie 300. demolition: removal of clerestory windows, celing @ conference room, new partitions, doors, electrical, suspeded ceiling and finishes. all work in interior.
-
Sep 2009
Deteriorated stucco is to be removed. brick behind the stucco is to be inspected and repaired as necessary. stuuco is to be replaced over the brick in the patch aresas. work include one cornice and upper parapet repairs. claude lane elevation of the building. is to be painted.
-
Oct 2009
Retail tenant improvement to existing retail space. ti includes: mechanical, plumbing, electrical, interior finishes. no changes to occupancy, no additional areas proposed. no changes to 9e) accessible restrooms.
-
Dec 2012
Barrier removal work - 4th floor restroom. work includes new partitions, doors & frame, new fixtures, finishes, lighting, minor plumbing & electrical.
-
Apr 2016
Reroofing.
-
Sep 2021
Fire life safety, install 1 fire alarm control panel, 1 led annunciator, 8 smoke det, 22 pull stations, 23 wall mount strobes, 2 ceiling mount horn strobes, 3 control relays, 2 dual monitor modules, 1 cellular communicator.
-
Dec 2022
Barrier removal project. demolition & construction of men & women common restrooms will be upgraded to full compliance. demolition of non-load bearing walls.
-
Apr 2023
Instlal new ductwork and exhaust fan as shown on m2.1. no new fire smoke dampers, new opwer and signal devices in restrooms and new 2019 t24 compliant lighting and controls. ref permit application 202212228980 for arch work.
DBI holds 52 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 52. 5 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 410 Bush Street Same street
- 429–431 Bush Street Same street
- 243–245 Kearny Street Same block
- 251–259 Kearny Street Same block
- 227–231 Kearny Street Same block
- 219–225 Kearny Street Same block
- 301–311 Kearny Street Around the corner
- 246–250 Kearny Street Around the corner