430–444 Bush Street
Financial District · San Francisco, CA 94108
-
1920s
Photographed, showing the Pacific Telephone & Telegraph Company building.
-
1924
Pacific Telephone Company building, designed by Bliss & Faville.
-
July 2, 1964
Photographed, showing the Pacific Telephone & Telegraph Company building.
-
Jan 1982
Additions alterations or repairs.
-
Feb 1986
Conversion of existing building housing tel. equipment.
-
Mar 1990
Single floor b-2 occcupany tenant improvement.
-
Sep 1992
Cti 1 fl o6 (el-me-sp).
-
Sep 1992
Cti 2 fl 06 ( el me sp).
-
Jul 1996
Seismic strenghtening.
-
Jun 1997
Reroofing.
-
Dec 1997
Cti-1 3l, me, sp, 3rd floor.
-
Apr 2002
Furnish and test fire detection.
-
Mar 2006
Modernize passenger gearless elevators 1-3w/new controls, selectors, hoistway wiring and recondition/modify after equipment such as signals & fixtures, door operating equipment: machines, provide new circuits, disconnects & control power supply for elevator gear, install gfi receptacles, misc control.
-
Nov 2006
Hvac upgrades: replace package ac unit.
-
Dec 2009
Coolong tower replacement on roof. relocation to new area on roof.
-
Jun 2010
A new unnamed roof top telecomunications facility consisting of adding 3-new 2106 rbs cabinets, 3-new 3106 rbs cabinets on a 17'-0"x32'-0". lease area located on the roof, new 18" cable tray. also adding 12-new antenna paint to match existing building. & a new gps antenna.
-
Jul 2011
A new unmanned roof top telecom facility adding (1) new rba72 lte cabinet, (2) new purcell lte cabinets, (5)new 3106 rbs cabinets on a 16'11" x33'4 1/2" lease area located on the roof, new 18" cable tray, also adding (11) new antennnas paint to match existing building. less than 50 gallons of electrolite.
-
May 2013
Demolition of existing partition non load bearing, ceiling and finishes. install new non-load bearing partitions, ceiling, finishes. modification of existing mechanical, electrical and plumbing distribution system.one hour windows on grant side of building and not rated on bush.
-
May 2014
Demolition of existing non load bearing partition, ceiling & finishes. install new non-load bearing partition, ceiling & finishes. modification of existing mechanical, electrical & plumbing distribution system. replace existing windows glazing. 1 hr on building sides & non rated on bush street side. replace.
-
Jul 2015
Demoexistingnon-load bearing partitions, ceilings, ductwork, electrical conduit& plumbing fixtures.install new ceiling, interior partitions, lighting, doors, finishes&plumbing fixtures.alter both mechanical&electrical sys.refinish interior sideexistingexterior window frames.n/a maher ord.
-
Oct 2016
Upgrade existing restroom facilities & drinking fountain to comply with current accessibility reqs at 1st floor maher na.
-
May 2019
4th floor - ti - select demolition and limited construction of partition walls, upgrade to interior finishes and restroom accessibility, no change to structure, no exterior or bld envelope changes. maher n/a.
-
May 2019
2nd floor - ti - select demolition and limited construction of partition walls, upgrade to interior finishes and restroom accessibility, no change to structure, no exterior or bld envelope changes.
-
May 2019
Tenant improvement of interior office spaces at floor 1 to include slelect demolition and limited construction of partition walls, upgrades to interior finishes and restrooms. no exterior work.
-
May 2019
6th fl - ti of interior office spaces. demolition and limited construction of partition walls, upgrades to interior finishes and restroom accessibility. no change to structure, no exterior of building envelope changes.
-
Dec 2021
Renovation of a portion of the existing lobby. work to include the installation of new decorative columns, decorative sculptures, electrical work, new wall finished and new ceiling finishes.
-
May 2024
Install (1) standby packaged 2mw 4160 volt diesel generator #3 (gen-3) & its associated after treatment system on the roof of 430 bush. provide & install fuel piping which transfer between the two buildings. provide & install piping for the equip. mentioned above. all misc. arch, mechanical, electrical, &.
DBI holds 110 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 110. 9 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 429–431 Bush Street Same street
- 453–455 Bush Street Same street
- 460 Bush Street Same block
- 410 Bush Street Same block
- 466 Bush Street Same block
- 555 Pine Street Same block
- 251–259 Kearny Street Around the corner
- 417–419 Grant Avenue Around the corner