A bronze and glass fountain sculpture at the hotel's entrance lobby and facade, required under the city's 1% for the arts program (Case No. 2000.171X).
Permit history
-
Apr 1981
New construction.
-
Sep 1982
Building use: comml.
-
Oct 1983
Demolitions.
-
Oct 1984
Temporary wood fencing.
-
Jan 2002
Erect a 10 story hotel with 86 guest rooms.
-
Nov 2002
Underpinning of lots 39-40 adjacent to 466 bush st.
-
Nov 2002
Shoring @back of sidewalk @property line @466 bush & lot 42.
-
Dec 2004
Shoring and underpining to permit application 2002/01/23/7562.
-
Feb 2005
Installation of new fire sprinkler system in new 10 story and basement hotel complete with 2) stand.
-
Mar 2005
Amendment to app#200201237562/s2/r4 issued 07/03/03. tower crane foundation added. shotcrete walls.
-
Aug 2005
Rev.to appl#200201237562 detail 5/s5.2 raise slab dowel to go up into wall i/o down.
-
Sep 2005
Renew appl#200412171687 for final inspection.
-
Sep 2005
Installation of food establishment (restaurant) for mep in existingg space, see application #200201237562 for reference, total occupancy less than 50.
-
Apr 2006
Install fire alarm and communication system per cbc chapter 403. subsystems include: smoke detection, alarm transmission, emergency voice alarm signaling, fire dept. communication system. smoke control, annunication.
-
Jul 2006
Install fire supression system anusl in kitchen on 1st floor. ansul r102. fire alarm under sep permit. 18 flows total 22 allowed, 2-3 gallon tanks.
-
Aug 2006
To erect single faced electrical sign.
-
Sep 2006
Install fuel oil piping system to fill tank on electrical emergency generator. revision 1 changes pipe routing from roof to 10th level. revisions to approved permit application 200201237562/s5.
-
Oct 2006
Renew 200201237562, 200412171687, 200509122534.
-
Mar 2007
App #200201237562s4 - as-built revise stair #1 smoke vestibule in bsmt. kitchn grease exhaust duct: fire wrapped in lieu of 2 hr shaft enclose. kitchn exit dr g25b change door swing direction. revise 9/f terrace drs to meet ada.revise staff toilet(sk-145).
-
Mar 2007
Renew permit application #2005/08/02/9264 for final inspection.
-
Sep 2007
Renew permit application 200703065585, #200503086996 for final inspection.
-
Jul 2025
Change communication path of the existing dedicated function central station fire alarm monitoring system to sole path cellular balance of system shall remain as is.
5 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Certified
The hotel opened in November 2006 as the third LEED-certified hotel in the country and the first in California; the US Green Building Council issued the certificate on 31 May 2007.
Not yet documented: the developer, the early tenants and when each artwork was installed. The assessor records 2007; the Los Angeles Times reported the hotel opened in November 2006. Submit an update