Newhall Building
260 California Street · Financial District
-
1910
Built.
-
June 1930
Lewis P. Hobart drew plans for a two-storey Class A addition to the Newhall Building, at $180,000, with T. Ronneberg as engineer.
-
July 1937
A $70,000 steel-frame addition of one storey and a penthouse was being built on the office building, from drawings by Warren C. Perry, with the Dinwiddie Construction Company as contractor.
-
Oct 1981
Additions alterations or repairs.
-
Jul 1995
Cti-1 floor 7th, renovation of toilet room.
-
Oct 1995
Adding 2nd floor fire escape, architectural, mechanical.
-
Dec 1995
Elevator lobby renovations, fire sprinkler upgrades.
-
May 1996
Cti-1 (el sp) 6th fl.
-
Oct 1997
Cti-1 floor 4th el me l/s sp.
-
Oct 1998
Oti-1 10/f el me l/s sp.
-
Nov 1998
Oti 2 10th floor, ls & sp.
-
Nov 1998
Oti 2 8th floor, ls & sp.
-
Oct 2000
Oti- 1 9th floor el, me, l/s & sp.
-
Jan 2001
Oti-1 7th floor, el, me, ls, sp.
-
Jun 2004
Oti-1 12/f el me ls sp.
-
Jun 2004
Structural work for fire place construction. existing room alteration. to p/a#200406085829. (oti#1).
-
Feb 2005
Interior t.i. to install anew full floor tenant (3583sf) work includes new partitions, finishes & mill.
-
Aug 2012
Ti for bank on ground floor. work includes new fixtures, finishes, non bearing partitions, relocation of atm. no exterior work. no changes to mep. fp under seperate permit.
-
May 2013
Ti, remove walls, ceiling add new lights, new flooring, expose existing brick, extend existing walls from ceiling level to slab above.
-
Oct 2014
Ste 500: interior remodel of part of e eoffice for marketing purpose including minor demolition of ceilings, millwork, flooring, wall along exterior wall, installation new doors, walls, lighting and finishes. electrical and mechanical under sep permit.
-
Jun 2016
Demolition of existing non-structural interior partitions, millwork, electrical, ceilings & lighting. removal of structural column & install new non-structural interior partitions, millwork, electrical, ceiling & lighting & installation of new structural support avoce ceiling at area of demolition'd column.
-
Nov 2016
Non structural demolition. new partitions, doors, ceiling lights and millwork. n/a for maher.
-
Nov 2016
M & e associated with approved app#201611031818.
-
May 2019
10th floor ti includes new non structural partitions, mep, life safety and sprinklers under sep permit; demolition permit 201901311695.
DBI holds 174 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 174. 7 of them are nominal $1 street-space or sidewalk permits. 4 expired permits are not shown.
Units
26 units on the assessor's roll, 44,405 square feet between them. Each has a page of its own: its assessed value, last sale and permits.
- Unit 15,112 sq ft
- Unit 24,277 sq ft
- Unit 3-A1,361 sq ft
- Unit 3-B1,255 sq ft
- Unit 3-C973 sq ft
- Unit 4-A1,361 sq ft
- Unit 4-B1,255 sq ft
- Unit 4-C973 sq ft
- Unit 5-A1,361 sq ft
- Unit 5-B1,255 sq ft
- Unit 5-C973 sq ft
- Unit 6-A1,361 sq ft
- Unit 6-B1,255 sq ft
- Unit 6-C973 sq ft
- Unit 7-A1,361 sq ft
- Unit 7-B1,255 sq ft
- Unit 7-C973 sq ft
- Unit 8-A1,361 sq ft
- Unit 8-B1,255 sq ft
- Unit 8-C973 sq ft
- Unit 9-A2,618 sq ft
- Unit 9-B987 sq ft
- Unit 10-A2,618 sq ft
- Unit 10-B987 sq ft
- Unit 113,480 sq ft
- Unit 122,792 sq ft
Nearby
- 244–256 California Street Same street
- 311–325 California Street Same street
- 220–222 Battery Street Same block
- Tadich Grill and Buich Building Same block
- 220–230 California Street Same block
- 212–214 California Street Same block
- Embarcadero Center West Around the corner
- 100 Pine Center Around the corner