559–561 Clay Street
Financial District · San Francisco, CA 94111
Permit history
-
Jan 1985
Earthquake bracing for parapets.
-
Jun 1999
Seismic strengthening to comply with sfbc.
-
Aug 2000
One stop: demolition to prepare building for new seismic sheathing, removel int. finishes.
-
Oct 2002
Repari and replacement of front sidewalk structural slab outside 559 clay st over basement.
-
Feb 2003
Reroofing.
-
Sep 2003
Addition structural headers, enlarged commercial st. lobby, additional work to x.
-
Oct 2003
Install new sprinkler system on all floors 4th floor & basement.
-
Jun 2005
To serve furniture showroom on g/f, install display platform, shelf, bar counter, kitchen countet, s.
-
Sep 2007
T/i on floors 3&4 to provide new walls, interior windows and doors, carpet and flooring.new intervening stair from 3 to 4. new concrete floating floor on 3rd floor. structural, mechanical, electrical, sprinklers under sep. application.
-
Sep 2007
3rd & 4th floor structural work for new intervening stair and strengthening of screening room floor. ada on t.i. plan #2007/09/28/4002.
-
May 2009
Demolish existing partition walls to accommodate new work, new partition walls, new suspended ceiling, new lighting, new finishes, new mechanical, electrical, plumbing, life safety work on separate permit, all work to be performed at ground entry vestibule & 2nd floor only.
-
May 2009
1st floor: install new non bearing partition walls to create a conference room and 2 offices. new suspended ceilings at conference room and offices. new carpet and tiles. (electrical, mechanical, and life safety under sepearate permit).
-
Jun 2018
Voluntary remedial foundation leveling.
-
Jul 2018
3rd & 4th floor - demolition of existing non structural partitions ductwork & ele distribution in an existing office space. mep & fire deferred submittal. per ab-017.
-
Aug 2018
Remodel of existing office on 3rd & 4th fl mep and sprinkler on separate permit.
-
Oct 2018
3rd & 4th floors - revise existing fire sprinkler system for ti. no underground work.
-
Oct 2018
Structural corrections to levels 3, 4, roof which were not installed per previous approved and finaled permits 200206149133 and 200709284005. maher n/a.
-
Nov 2018
Permeation grouting in basement. n/a for maher.
-
Jan 2019
Mechanical: install (1) new wshp (1) new exhaust fan. relocate (1) wshp, relocate (1) existing wall mounted fcu, demolish 3rd fl cws/r piping and install new piping, install new supply duct. ref 201808248246 original pa.
-
Jan 2019
Fire alarm - install: 4 wall mount strobes, 1 ceiling mount strobe, 2 wall mount horn strobes, 8 ceiling mount horn strobes, 6 duct det, 6 control modules ref 201808248246.
-
Jul 2019
Ti on 1st and 2nd floor of 4 story bld including demolition of existing space, non structural partition, ceiling, casework, finishes and mep work, signage deferred.
-
Nov 2019
Fire sprinkler permit install 75 pendents and 3 upright sprinklers on the 1st & 2nd fl. ref pa 2019-0716-6032.
-
Nov 2019
Fire alarm ti - install 10 ceiling mount strobes, install 4 wall mount strobes, install 12 ceiling mount horn-strobes, install 5 duct detectors, install 5 control relay module & install 1 booster panel. ref permit application 201907166032.
-
Aug 2021
Tenant improvement in existing basement. all mep permit to follow.
-
Dec 2021
Basement: relocate 15 pendents, add 6 new pendents, plugs, 4 branch lines for t.i. permit application 202108065979.
DBI holds 78 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 78. 20 of them are nominal $1 street-space or sidewalk permits.