540–550 Montgomery Street
Financial District · San Francisco, CA 94111
-
1921
A Bank of Italy branch here was one of several carrying a Russian-language department from 1921.
-
May 1987
Install partitions, ceilings, cabinets, doors, lighting.
-
Jul 1987
Provide partitions, acoustical ceilings, floor coverings.
-
Jun 1988
Replace interior partitions, acous clg, electrical, duct work.
-
Mar 1989
Cti.
-
Apr 1990
Commercial tenant improvements.
-
Mar 2001
Oti-1, 3rd floor, lt, me, ls, sp.
-
Nov 2001
Oti 1 4th fl tenant imp minor demolition e partitions/build new offices & support facilities.
-
Mar 2011
Commercial office tenant improvements to existing office space at 7th floor. no changes to existing structure building envelope, proposed scope of work for demolition of existing int. partitions and ceiling grid.proposed full accessible suite 750 - upgrade to ext restrooms.
-
Jun 2011
1st & 2nd floors-proposed improvements to existing building lobby @1st fl & mezz. no changes to existing building envelope, exterior facade, exiting of accessible path of travel. scope of work includes interior demolition of finishes, proposed new guardrails, existing interior wall partition modifications & ceiling modificatio.
-
Jun 2011
Office ti on the 5th floor, suite 550. propsed interior partitions and ceiling grid. no change to existing structure, building envelope and path of travel. mep on separate permit.
-
Jan 2012
#800: commercial office tenant improvements to existing office space at 8th floor, proposed new interior partitions, millwork, finishes proposed new accessible restrooms. no change to existing structure or building envelope.
-
Oct 2012
Change of use from vacant office & lounge to private lounge, office, bar & wine storage spikes. existing kitchen to be updated for code compliance existing 10th & 11th floors bathrms will be upgraded to ada compliance. 11th fl existing bathrm will be upgraded & a new accessible bathrm will be added. mep, life safety.
-
Oct 2014
Construction new tenant improvement, new interior partitions, doors, finishes on 9th fl. upgrade restroms to make accessible. mechanical, electrical, plumbing, life safety on sep permit.
-
Oct 2014
Revision to appl #2014.1014.8782 - add radiators and outside air to commercial space.
-
Apr 2015
T.i. includes demolition of non structural partitions and build new non structural partitions. all new or revised hvac, electrical, plumbing and life safety work will be submitted seperately. building is not fully sprinklered, historic. n/a orindance #155-13.
-
Apr 2015
T.i. includes demolition of non structural partitions and build new non structural partitions. all new or revised hvac, electrical, plumbing and life safety work under deperate permits. building is not fully sprinklered, historic. n/a orindance #155-13.
-
Jun 2015
4th floor: perform mechanical heating improvements per plans and specs dated 5/28/15 by mhc engineers job #15-122.
-
Jun 2015
2nd floor: perform mechanical heating improvements per plans and specs dated 6/2/15 by mhc engineers job #15-122. n/a for maher.
-
Sep 2015
Revision to 2015-04-22-4314. changing out scope of elevator lobby walls & doors. new paritions etc in spec suite b. reconfigure break area millwork in suite a.egress change wich shall comply with cbc2013 1014.2.
-
Jul 2016
Gr and 2nd fl. ti demolition of interior structural. partitions and guardrail and building new structural. steel support, new guardrail, new non structural partitons. all new or revised mep, life safety, and sprinklers if need, under sep permit.
-
Dec 2016
3rd: interior non structural demolition, new partitions, doors, glazing & lighting. maher na mep/fire/life safety under sep permit.
-
Jan 2017
4th fl suite 450 ti new non structural partitions, doors/framing and interior glazing. all mep and l/s work design build submitted separately. building fully sprinlkered.
-
May 2018
3rd fl, ste 300: ti includes demolition of non structural partitions and build n non str partitions. all new or revised meps. life safety and sprinklers design build and submitted separately.
-
Sep 2022
Washing davits and tiebacks at the roof levels of 550 montgomery.
-
Sep 2023
Ground floor: convert from retail store to new bar, new ada restrooms, interior finishes & millwork. retain existing historic finishes, mep under separate permit. no cooking in this facility, no exterior work. no structural work.
DBI holds 167 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 167. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update