Asian American Bank Building
500 Montgomery Street · Financial District
-
1918
Built.
-
May 1982
Additions alterations or repairs.
-
1984
Known as the American Asian Bank; it was among the rated buildings of the city's Downtown Plan inventory.
-
May 1989
Install one atm.
-
Jun 1992
Demolition interior walls and ceiling.
-
Feb 1993
Voluntary seismic upgrade/install 2 concr.frames for add sup.
-
Sep 1993
Construction new elevator shaft and pit.
-
Nov 1993
Provide base building upgrade prior to new tenant work toilet rm.
-
Jan 1994
Tenant improvement 1st fo & portion of basement.
-
Apr 1994
Fire protection- 1st floor and basesment.
-
Aug 1999
Reroofing.
-
Apr 2002
T.i. on portion of 1/fl. and portion of bsmt.
-
Nov 2012
Interior soft demolition, construction of new pantry cabinets, conference room glazing and door and interior finishes. no exterior work.
-
Dec 2013
Demolition of non-load bearing partitions, doors, & finishes on 1st, 2nd, 3rd floors & mezzanine. no new construction. to remain vacant under ab-017.
-
Jul 2014
Removal of antenna, coax, mounts, & radio equipment. compliance with ordinance no 155-13 not required. (nextel).
-
Jun 2016
Reroofing. remove and replace flat roof.
-
Apr 2017
Interior tenant improvement for existing office. new kitchenette, new built-in work cubicles, new presentation/work area. no changes to hvac, lighting & electrical under separate permit. no structural work. n/a for maher.
-
Jun 2022
Construction non load bearing walls to create new office.move existing light fixtures and split units over, to fit new space, add some duct work and new glass wall panels.
-
Sep 2023
1st fl - fire only work for the volunatry replacement o f the fire alarm panel motherboard; the work adds a new cellular dialer & annuciator, as well as the direct replacement of 10 smoke detectors; 10 duct detectors, 5 pull stations, and 5 modules. no record plan or u certificate for this system.
-
May 2024
Bringing a partial height wall to full height up to deck to demise the mezzanine from ground fl tenant space. minimal restroom upgrade, patch & repair finishes. e) use of suite is design professional will remain the same. relocate partition @ groumd fl restroom x 2. no plumbing fixture increase.
DBI holds 44 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 44. 1 of them are nominal $1 street-space or sidewalk permits. 6 expired or cancelled permits are not shown.
Nearby
- 456 Montgomery Plaza Same street
- 505–527 Montgomery Street Same street
- 576 Sacramento Street Same block
- 520 Montgomery Street Same block
- PG&E Old Station J Same block
- 560 Sacramento Street Same block
- 624 Sacramento Street Around the corner
- Jack's Restaurant Building Around the corner