565 Commercial Street
Nob Hill · San Francisco, CA 94111
-
July 9, 1957
The Office of the Assessor-Recorder photographed the property for tax assessment.
-
June 13, 1962
The Office of the Assessor-Recorder photographed the property for tax assessment.
-
Jan 1982
Building use: offices.
-
May 1982
Additions alterations or repairs.
-
Jun 1983
Heating and air conditioning units.
-
Oct 1983
Alteration to orig building permit relocate lightwell.
-
Apr 1984
Convert space to restaurant.
-
Sep 1984
Tenant improvement-partitions.
-
Sep 1984
Install 8 ft. diameter spiral staircase.
-
Oct 1984
Tenant improvement.
-
Aug 1992
Sign.
-
Sep 1997
Repair & support existingmasonry parapet.
-
Oct 2002
Reroofing.
-
Jan 2009
Interior demolition only of existing restaurant per ab017-deferring accessibility requirements.
-
Feb 2009
Interior renovtion of 1337 sq ft restaurant for reuse of restaurant. existing kitchen to remain. existing restrooms to remain with minor work to meet ada. new awning to be added above door.
-
Apr 2009
Tenant improvement-relocate 9 fire sprinkler heads.
-
May 2009
1st floor-ul300 upgrade of the pyro chem fire suppression system in the kitchen area on the ground floor. 11 flows.
-
Sep 2015
Replacement of e bartop and addition of ada bar counter. addition on new dining room and back of house space. mep, back of bar under separate permit. no work on e kitchen. fire sprinkler/alarm sep permit if necessary.
-
Oct 2015
Replacement of entry canopy: adding 2 sconce light fixtures and a decorative clock on the sacramento street facade. n/a for maher.
-
Oct 2015
Installation and relocation of back of bar service equipment, no work on existing kitchen. accessibility upgrades in ref pa 2015 0928 8192. fire protection alarm under sep permit. maher na.
-
Dec 2015
Relocate 6 existing sprinklers and change to concealed sprinkler, change 6 painted sprinkler. t.i. permit application 201509288192. n/a ordinance #155-13.
-
Feb 2016
1 relocate & change to concealed type sprinklers, 4 head to existing sprinkler system. t.i. permit application 201509288192. n/a ordinance #155-13.
-
Feb 2019
2nd floor. demolition of non-structural walls, constructin of new tenant suite incl non-structural walls, plumbing, ceiling and lighting systems. mechanical, electrical, plumb, life-safety and sprinklers to be design-build under separate permits. maher n/a.
-
Mar 2019
2nd floor. modification of existing fire sprinkler system per tenant improvement. ref permit application 201902132782. relocate 5 sprinkler heads.
-
May 2019
3/f & 4/f: non structural demolition - new non structural partitions, lighting, finishes & toilet rooms; no change in occupancy, use or area. mep, life safety & sprinklers under separate permit.
-
Jul 2019
3rd & 4th fl: modification of existing fire sprinkler system per ti at 3rd and 4th floor. relocate 5 add 1 sprinkler head (ref: 201905291865).
DBI holds 29 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 29. 2 of them are nominal $1 street-space or sidewalk permits.
The assessor dates the building to 1985, after these photographs were taken. Not yet documented: the architect and builder and the early tenants. Submit an update