753–777 Davis Street
Financial District · San Francisco, CA 94111
Permit history
-
Feb 1982
Additions alterations or repairs.
-
May 1982
Additions alterations or repairs.
-
Nov 1982
Building use: offices.
-
Jul 1985
Interior demolition- drywalls & plaster only.
-
Aug 1985
Alter existing 2nd floor space.
-
Mar 1986
Tenant finish work/base building work under appln. #8509056.
-
Jun 1986
Tenant improvement alterations.
-
May 1988
Demolition walls, reconfigurate built-in workstations.
-
Dec 1988
Add 2 partition walls to create 2 new offices.
-
Mar 1990
Braces parapet connects joists to exterior.
-
Sep 1992
New partition. electrical.
-
Jul 1995
Seismic upgrade.
-
Apr 1996
Soft demolition only, sismic upgrade under separate permit.
-
May 1996
Revisions to 9511587, seismic upgrade under separate permit.
-
May 1996
Cti-1 floor 1st el me.
-
Mar 2003
Reroofing.
-
Apr 2003
Replace existing deck, add guiderails to existing fire escape, add exterior lights to illuminate pat.
-
Nov 2005
Oti-1 2nd floor el ls me sp.
-
Dec 2005
Oyi-22nd fl el, rev: to 200511017026.
-
Dec 2005
Revision toi permit application 200511017026.oti-1 rev. 2nd fl.
-
Jul 2008
Install bathroom that was been removed without a permit, comply with nov# 200856515.
-
Apr 2014
Prov a new volun auto&manual fire alarm sys incl partial auto smoke detection in common use area except in kitchens where heat detectors shall be used. manual pull stations atexisting.wtr flow&valve tamper monitoring.duct smoke detec&auto shutdown for hvac units.audio visual ada compt devices thruout bld.
-
Aug 2019
Infill 4 windows at 2nd floor.
-
Dec 2024
To replace existing obsolete edwards (est-3) voice fire alarm with new generation edwards est-4 voice fire alarm system. no ref#: buidling permit #: this a fire panel replacement only.
DBI holds 34 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 34. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update