60 Broadway
North Beach · San Francisco, CA 94111
Permit history
-
Jul 1989
Fabricate and install awning.
-
Mar 1992
Seismic upgrade to existing building include foundations & brick repr.
-
Mar 1992
Demolition of non-bearing partitions and 1st floor slab.
-
Aug 1998
Paint wall.
-
May 1999
Erect non structural wall single faced painted sign.
-
Aug 2008
Renovate existing open office area @ 2nd floor & add 5 new private offices by adding partition walls. upgrade warning strips @ main entrance stairway to 2nd floor @ lobby. add h/c door sign @ h/c restroom @ ground floor. interior work only.
-
Jun 2009
Renovate existing filing room to 5 new offices and a electrical room.mep under separate permit.
-
Jul 2009
Redistribution of hvac ductwork, t.i. reference permit application 200906251241.
-
Feb 2012
Install 8 skylights, 3 interior glass sidelights and remove selected interior partitions and relocate 1 partition.
-
Jul 2014
Unmanned telecommunications facility consisting of 9 new antennas behind screens, and associated radio equipment; maher n/a.
-
Jan 2015
Demolition of existing office interior in preparation for tenant improvement (per ab017).
-
Feb 2015
Interior t.i. office space renovation. removal of existing stair to be replaced with new stair as well as new ceiling, new floor finishes, new interior partitions, new plumbing fixtures, new mechanical equipment & new lighting. n/a maher ordinance.
-
Mar 2015
Replacement of non historic storefront & entry door system recessed storefront entry door. ref permit application 2015 0206 7699 maher - not req'd.
-
Mar 2015
New fire alarm system for ti of existing building to include 1 facu, 1 annunciator, 6 pull stations, 2 smoke detectors, 11 duct detectors, 12 relay modules, 16 horn strobes, 8 strobes maher not req.
-
Apr 2017
T.i.: replacement of existing lighting and wall, ceiling & floor finishes. ceiling to include framing support for custom table.
-
Sep 2017
1st fl: adding 1 wall horn strobe. relocate 1 existing duct detector & relocating 1 existing relay module. maher na.
1 nominal $1 street-space or sidewalk permit is omitted from the timeline.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update