One Lombard Street
1–15 Lombard Street
-
1899
The site, filled from the bay in the early 1850s beside the Greenwich Dock, was still an open wood yard for the Greenwich Dock Bonded Warehouse, with sheds for charcoal and shavings and a rail spur from the Embarcadero.
-
1901
Built for the City Warehouse Company as a three-storey brick warehouse with a partial attic around heavy timber posts and beams, designed by Percy & Polk — George W. Percy and Willis Polk's brief partnership, of whose seventeen or so works it is the only warehouse, and Polk's first. The Union Can Company, the largest maker of fruit and salmon cans on the Pacific Coast, was its first occupant, until the building came through the earthquake and fire and the company moved away.
-
1904
Built.
-
1924
All its windows were bricked up, the arched openings left in place, while the Merchants Ice & Cold Storage Company occupied it; the ice company was here for nearly seventy years, until 1975.
-
1976
Most of the windows were reopened, revealing the original wood sashes still in the attic; offices followed from 1978, among later tenants the San Francisco Bay Club fitness centre.
-
July 1, 1976
The City Planning Commission unanimously granted a certificate of appropriateness for a three-storey parking garage on the site, built with the restoration of the Merchants Ice and Cold Storage Building and an adjacent industrial building for commercial use, inside the proposed Northern Waterfront Historic District (Resolution 7522).
-
Feb 1983
Misc.
-
Sep 1988
Tenant improvements, incl partitions, finishes, fire sprlrs.
-
Jan 1989
Interior renovations, including partitions, ceiling, wall.
-
Jun 1991
Remodel of tenant spaces, & alteration of partitions.
-
Jun 2002
15, 000 s.f. commercial tenant improvement-on 1st, & 2nd floor, for exercise room at bay club sq ft.
-
May 2005
Oti-1, 3rd floor, el, me, ls, sp.
-
Jun 2005
Oti-4, 3rd floor, sp.
-
Jun 2005
Oti-3, 3rd floor, el.
-
Mar 2006
Oti-1 3rd fl-el, me, ls, sp.
-
Jun 2006
Oti-1, 3rd floor, el, sp.
-
February 3, 2010
Listed on the National Register of Historic Places as an excellent early twentieth-century industrial building and the first warehouse Willis Polk designed.
-
Oct 2014
Interior ti of non structural, demolition of existing office. new partitions, millwork, lighting electrical fixtures, telecome, plumbing and mechanical. no structural work. compliance with maher ordinance no. 155-13 not required.
-
May 2015
#200- demolition of some existing offices, rebuild some offices, existing lighting to remain. n/a ordinance #155-13.
-
Sep 2016
3rd floor: ti- include demolition of non-structural partitiond and building new non structural partitions to create new office conference rooms and new breakroom. all new or revised meps; life safety will be submitted separately.
-
Oct 2016
Suite 303: modification & expansion of existing t.i. to include selective demolition & construction of non-load bearing partitions, nw light fixtures including re-switching, nw storage & entry doors/fames, salvage & reuse of existing selectied materials if practicable, millwork & nw sink & finishes. n/a for maher.
-
May 2018
Suite 120: project consist of a ti. build out consist of demolition of existing partitions, power/data, finishes, ceiling & lighting and construction of new millwork, finishes, power/data, ceiling & lighting. mep & life safety drawings to be under sep permit. maher na.
-
May 2022
Reroofing. minimum sri of 75 (low-sloped, non-res).
-
Jun 2022
3rd fl office t.i. to include new partitions & mep.
-
Sep 2022
Supply and install wood support membranes for mechanical units.
-
Jan 2023
Title 24 drawings refer deck to the other 202206065640 new power and signal devices, title 24 compliant lighting and controls.
-
Oct 2023
Boiler replacement.
-
Mar 2024
Scope of work on 2nd fl shall consist of interior demolition of non structural elements including but not nec limited to interior partitions, doors, finishes, ceilings, lighting, mechanical, electrical outlets, switches. drawings 202206065640.
-
May 2024
Repair e) masonry: clean & repair brick wall & terra cotta parapet. remove unused embeded metal anchors & patch. stablize 2 brick windows arches using frp, & repair deteriorated mortar joint w. mortar to match e). repair & paint penthouse windows & replace perimeter sealant.
-
Jul 2024
1/f & mezz. -new floor finishes, light fixtures, ceiling finishes, conduits, switches, wiring, outlets, typ. in selected areas. restroom accessibility upgrade. interior non load bearing partitions. tenant improvement, no exterior work. no changes to e building structure.
-
Sep 2025
Deferred mep for permit application 202407085966: mechanical- demolition existing ductwork, registers, and fan coils where shown. relocate existing registers to new location, install new registers/t-stats. comfort balance. electrical-upgrade/replace lighting throughout half of the 1/f. title-24 compliant. plumbing-provide and.
DBI holds 123 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 123. 1 cancelled permit is not shown.