150 Lombard Street
North Beach · San Francisco, CA 94111
150 Lombard Street is a condominium building whose 73 apartments are held as 73 separate parcels — lots 005 through 077 on block 0059 — numbered 101 through 907 across nine floors.
Block 0059 carries a further 117 condominium parcels at 152, 154 and 156 Lombard Street — 190 in all, and the roll dates every one of them to 1975.
This page's parcel is lot 041, unit 505, so the assessed value and last sale shown below are that unit's and not the building's.
-
1970
Telegraph Landing North, designed by Henrik Bull.
-
1975
Built.
-
Sep 1985
Remodel kitchen.
-
Jul 2003
Reroofing.
-
Aug 2004
Remove existing deck coating materials & plywood substitute. replace with same.
-
Jun 2005
Remove & replace windows on 8 & 9th fl.elastomevic coating at ext of entire building.
-
Feb 2008
#104- relocate interior non-bearing walls. install new kitchen cabinets, countertops. paint interior. sheetrock and finish wall & soffit. add closet.
-
Jun 2008
Work @ one unit only. remove existing cabinets & appliances. install new cabinets, appliances, light fixtures in kitchen & living room ceiling. provide h.e. lights per title 24.
-
Sep 2010
Replace waterproof membrane. add planter at stairway.
-
Apr 2012
Replace (2) boilers. located in parking lot/basement on basement level, new flues.
-
Apr 2013
Waterproofing of courtyard deck & planting areas. new landscape & irrigation accessibility upgrades.
-
Aug 2013
One unit - remodel kitchen & 2 bathrooms; new hardwood flooring; relocate electrical. panel out of close per code reqt; install new light fixtures; new paint; all new lighting shall be "led" in the kitchen & bathrooms, exist bathroom exhaust fan to remain.
-
Mar 2014
Install (davit bases) at rooftop equipment for window washing, not visible form street. compliance with ordinance #155-13 not required.
-
Sep 2014
Interior remodel to one unit. remove & reconfigure existing interior partitons. upgrade flooring, ceiling, interior paritions, finishes. upgrade electrical and plumbing, existing common areas not included. compliance with maher ordinance 155-13 not required.
-
Oct 2016
167 sq ft store room addition to existing lobby building including new sink & electric work.
-
Dec 2016
One unit: reconfigure 2nd bedroom/den, reconfigure closet/hallway, remodel existing kitchen & bathrooms. replace plumbing fixtures and appliances new lighting & electrical maher na.
-
Mar 2018
Residential entry lobby. new interior finishes, lighting, and reception desk. n/a for maher.
-
Oct 2018
Voluntary fa replacement project per sffd approved pre-application meeting minutes dated july 17, 2018. ** maher: n/a **.
-
Jun 2019
One unit: rearrange interior walls to add 1 new bedroom and closet, install new kitchen cabinets, relocate electric oven, and refrigerator, new light fixtures in living and dining room, replace 2 existing windows.
-
Jul 2020
Remodel kitchen like for like remodel master bath like for like, remodel hall bath like for like, upgrade electriacl panel.
-
Sep 2020
Building #1: interior remodel of existing building interior common corridors: new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint) and replacing exisitng light fixtures with new low energy (lep) light fixtures; new led lighting at select locations as required by code.
-
Sep 2022
Kitchen, master and guest bathroom remodel: powder room remodel: no change to windows, walls, and door opening.
-
Aug 2023
One unit: remodel 2 bathrooms like for like, new drop in-tub and new pre-fabricated shower pan; convert 3 bedroom space back to original 2 bedroom layout. partition non load bearing metal stud walls.
-
Aug 2024
One unit: remodel kitchen like for like with new kitchen cabinets, countertop and flooring. remodel hall and master bathroom like for like with new water mixing valves, wall tile, pre-fabricated shower pan, new vanitites and tops.
-
Dec 2024
Building #1: addition to the existing fire alarm system. new nottification appliances will be added to provide proper coverage for area of work. all new notification appliances will be connected to existing remote power supply. these appliances will be activated on general alarm condition. 1-remote power supply.
-
Mar 2025
Reroofing (no hotworks) cenc exception 2 to section 140.3(a)1aia.
-
Aug 2026
One unit: kitchen remodel like for like, new cabinets, sink, counter tops, p traps, replace gfci receptacles, swicth lights under cabineys, install new flooring, new dishwasher. bathroom remodel, new vanity, sink, angle stops, p traps, vanity tops, replace 2 lights, 2 gfci switch, shower head.
DBI holds 156 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 156. 38 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 290 Lombard Street Same street