665 Pine Street
39-unit apartment building · Financial District
-
1927
The Portas Del Mar Apartments.
-
1928
Built.
-
Nov 1981
Additions alterations or repairs.
-
Sep 2007
One unit- kitchen/bathroom remodel in kind.no structural changes.no window door or wall alterations.kitchen: at least 50% of lighting wattage must be fluorescent.bath: fluorescent or motion controlled sensor. exhaust termination 3' min. from pl & building. openings.
-
Jul 2017
One unit: convert existing kitchen to bedroom, relocate kitchen, rehabilitate existing bathroom, install washer & dryer. n/a ordinance #155-13.
-
Aug 2017
Kitchen and bathro0om remodel, no change in wall locations.
-
Mar 2018
One unit: convert dining to bedroom. rehabilitate existing kitchen & bathroom. install washer/dryer. maher n/a.
-
Sep 2018
One unit - rehabilitate existing kitchen, rehabilitate existing bathroom, install washer/dryer. fire alarm and sprinkler on separtae permit.
-
Nov 2018
One unit - convert existing kitchen to bedroom, relocate kitchen, rehabilitate existing bathroom, install washer/dryer.
-
Feb 2019
One unit: convert e dining to bedroom, rehabilitate e kitchen, rehabilitate e bath, install washer dryer. no exterior work.
-
Jul 2019
One unit: convert existing dining to bedroom. rehabilitate existing bathroom & existing kitchen. install with d.
-
Oct 2019
#802: convert existing dining rm to bedroom. rehabilitate existing kitchen & bathroom. install washer & dryer.
-
Oct 2019
One unit: convert e dining to bedroom, rehabilitate e kitchen, rehabilitate e bath, install washer dryer. maher n/a.
-
Oct 2019
One unit rehabilitate e kitchen, existing bath, install washer dryer.
-
Mar 2020
Upgrade existing fire alarm system to comply with sffc 1103.7.6.1 & nfpa 72 ** maher: n/a **.
-
Dec 2020
One unit: convert existing dining room to bedroom. rehabilitate existing kitchen & bathroom. install washer & dryer.
-
Apr 2021
#404: 1) 1)rehabilitate existing kitchen. 2)convert existing dining room to bedroom. 3)rehabilitate existing bathroom. 4)install washer and dryer.
-
Jun 2021
One unit 10th floor: 1) rehabilitate existing kitchen, 2) convert existing dining to bedroom. 3)rehabilitate existing bathroom. 4) install washer and dryer. partially sprinklered building.
-
Dec 2021
One unit: convert existing dining room to bedroom, convert existing closet to office. rehab existing kitchen & bathroom. isntall washer/dryer.
-
Dec 2021
One unit: convert existing dining to bedroom. convert existing closet to office. rehabilitate existing kitchen & bathroom. install washer & dryer.
-
Jul 2022
One unit. convert existing dining to bedroom. rehab existing kitchen, rehab existing bathroom. install washer/dryer.
-
Aug 2022
One unit. rehab existing kitchen, convert existing dining to bedroom, rehab existing bathroom, install washer and dryer.
-
Aug 2022
One unit. rehab existing kitchen, convert existing dining to bedroom, rehab existing bathroom, install washer and dryer.
-
Sep 2022
One unit: rehab existing kitchen. convert existing dining to bedroom. rehab existing bathroom. install washer and dryer.
DBI holds 57 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 57. 8 of them are nominal $1 street-space or sidewalk permits. 3 expired or cancelled permits are not shown.
Nearby
- 626 Pine Street Same street
- 679 Pine Street Same street
- 550 Stockton Street Same block
- 530 Stockton Street Same block
- Notre Dame des Victoires Church and Rectory Same block
- 566 Bush Street Same block
- 535 Stockton Street Around the corner
- 601 Stockton Street Around the corner