530 Stockton Street
Chinatown · San Francisco, CA 94108
-
1923
Built.
-
1925
Stockton Court Apartments, designed by architect John Carl Hladik, who was known for his apartment buildings.
-
Feb 1989
Asbestos removal.
-
Jun 2004
Reroofing.
-
Jan 2009
#501- remove & replace kitchen cabinets in kind, install new countertop. in bathroom, remove & replace ceramic tile around bath tubs walls & floor, new ceramic tile to be installed in a morter base on floor & around bath tub walls.
-
May 2014
In one unit only: remove and replace kitchen cabinets in kind. install new counter top. in bathroom remove ceramic tile around bath tub walls, install new ceramic tile in it's place. new tile to be set in a mortor base. replace vanity cabinets. no structural work, no wall change.
-
Jul 2015
Two units: bathroom: remove and replace ceramic tile floor and vanity cabinet. kitchen: remove and replace cabinets in kind and countertops. one unit: replace ceramic tiles on the 3 walls around bathtubs. no structural work.
-
Oct 2015
#306- kitchen- remove & replace cabinets & counter top in kind. bathroom- remove & replace ceramic tile on floor & around 3 walls of bath tub, replace vanity cabinet. no structural work.
-
Apr 2016
One unit. remove and replace kitchen cabinets in kind and replace countertop, bath. remove and replace ceramic tile on floor and around 3 walls of bath. replace vanity cabinet, no wall change. no structural work.
-
Sep 2016
One unit: remove and replace kitchen cabinets in kind & replace countertop. bathroom: remove & replace ceramic tile on floor & around 3 walls of bath tub. replace vanity cabinet.no wall change, no structural work.; maher n/a.
-
Dec 2016
One unit kitchen & bathroom remodel. no wall changed or structural work. n/a for maher.
-
May 2018
Renovation of 3 two units on 1st floor and 307 on 3rd fl. new bedrooms, new dishwashers, new kitchen cabinets, new plumbing fixts. new lighting at j-boc locations. no change to mechanical. no exterior work. no fire alarm or sprinkler work. no structural work. n/a for maher.
-
Jul 2018
Kitchen and bathroom remodel, new cabinets, sinks, toilets. no walls moved.
-
Aug 2018
(one unit)renovation on 6th floor: new bedroom, new dishwasher, new washer dryer, nw kitchen cabinets, nw plmg fixtures, nw lighting at existing jbox locations. no change to mechanical. no exterior work. no fire alarm or sprnkl work. no structural work.
-
Nov 2018
Kitchen bath remodel, replace existing light fixtures. no structural, no outside work.
-
Jan 2019
Two units kitchen and bath remodel, replace kitchen cabinets and bath fixtures, add washer and dryer, replace existing light fixtures. all in kind.
-
Feb 2019
Two units: remodel kitchen and bathroom. install new electrical subpanel.
-
Apr 2019
Two units: remodel kitchens & baths, kitchen approx 4'x8', bath approx 5'x6'.
-
Aug 2019
Two units: kitchen & bath remodel. new kitchen cabinets, bath fixtuers, flooring. bath sq ft approx 30. kitchen sq ft approx 48. nol alteratiion of walls.
-
Aug 2019
One unit. kitchen and bath remodel. install new kitchen cabinets & appliances, new flooring throughout, new tub, navity, sink & toilet. no mechanical change, no fire sprinklers, no structural, no exterior work.
-
Dec 2019
Ground fl adus per ord 162-16, convert existing garage & storage (3) units at space into new dwelling unit with existing envelope, five new bathrms, 3 new dishwashers, 3 new washer/dryers, new windows facing street, sprinkler & fire alarm under sepreary permit.
-
Oct 2020
One unit: renovation of new bedroom, new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at existing j-box locations. no exterior, fire alarm/sprinkler and no structural work.
-
Nov 2021
Install residential fire sprinklers nfpa13 and new 2" copper underground piping from the meter to fire riser 2" dedicated fire service to cover new adu units on ground floor only. 49 sprinklers.
-
Jan 2022
Like for like fire system replacement with new panel smoke det & pull stations at the same location. install new radio comm monitor modules to tie in flow & tamper. tie in existing horn/strobes to new panel. install low frequency horns in every unit. no elevator recall. 202111303300, 201912311128.
-
Apr 2022
One unit: remodel of (1)existing kitchen and (1) bathroom, new plumbing fixtures, new cab, new lights, no change to layout.
-
Jul 2022
Unit's: 206, 405, 601: kitchen bathroom remodel like for like. no change on layouts: new light fixtures, plumbing fixtures for all units mentioned.
-
Jun 2024
Reroofing.
DBI holds 50 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 50. 6 of them are nominal $1 street-space or sidewalk permits. The assessor's roll gives 1923; this address is recorded as built 1925.
Nearby
- 441–447 Stockton Street Same street
- 600 Stockton Street Same street
- 679 Pine Street Same block
- 566 Bush Street Same block
- 586–598 Bush Street Same block
- 417–419 Grant Avenue Same block
- 701 Pine Street Around the corner
- 618 Bush Street Around the corner