1926
Built.
-
Jun 1991
Parapet.
-
May 1997
Reroofing.
-
Nov 2008
Work @ one unit only. remodel 1 kitchen & 1 partial bathroom. upgrade kitchen & bath. no structural cabinets, counter. (new fixtures for bath).
-
Mar 2009
Comply with nov# 200994110 (1 to 5 & 7 & 8). patch holes in garage ceiling, repair window glazing. repair damage floor at exit landing. install garage door rent, door closer on exit doors.
-
Jan 2013
Replace kitchen cabinets & countertops. replace vanity cabinets, sink, faucet, replace kitchen sink & faucet. relocated sub-panel & upgrade. change outlets, switches & lighting, 50% of lights in kind will be high efficacy.
-
Dec 2013
Window replacement - existing double hung window (150) on east, wouth, west facades with same like and type pella architect series windows - 2 street sides visible and grids to match existing exactly. u-factor not more than.4.
-
Feb 2014
One unit: kitchen remodel, replace cabinet, counter top; bathroom remodel, replace sink, shower; electrical upgrade, add lights will be high efficacy. no structural work.
-
Jun 2014
One unit: kitchen & bathroom remodel, replace cabinet, counter tops, fixtures, replace toilet & vanity, upgrade electrical, no structural wall removal, lighting to comly with cec 150(k), no windows & no doors on this permit.
-
Sep 2014
One unit. kitchen remodel: replace tile floor, cabinet, counter top, plumbing fixtures. bathroom remodel: replace tile floor, vanity & plumbing fixtures. interior painting with electrical upgrade.
-
Oct 2014
#45: interior painting with electrical upgrade. kitchen remodel-replace floor tile, cabinet, countertop & plumbing fixtures. bathroom remodel- replace tile floor, vanity & plumbing fixtures. no new wall&no existing wall relocation. kitchen & bathroom remodel shall comply with cec 150(k)3&cec 150(k)5.
-
Sep 2015
Work in one unit: interior remodel 1 1 bedroom apartment. remodel bath with new fixtures and finishes. relocate e kitchen. add new walls to make 1 additional bedroom. electrical/plumb work inside apt.
-
Nov 2015
One unit: kitchen and bathroom remodel only.
-
Jul 2019
One unit - interior remodel - add new wall to make 1 additional den & remodel existing kitchen/bathroom in kind. replace all new fixtures, counter, flooring.
-
Jul 2019
One unit - interior remodel - add new wall to make 1 additional den & remodel existing kitchen/bathroom in kind. replace all new fixtures, counter, flooring.
-
May 2021
Install low frequency sounders to meet 75 db at the pillow per sffc section 1103.7.6.1 and replace fire alarm & existing devices.
-
Jul 2021
In accordance with abe (51-16). install power door operator.
-
May 2022
Reroofing.
-
Jun 2022
One unit - interior remodel: remodel kitchen/bath; replace/add new fixtures, counters & flooring; new lighting, fans, outlets and switches.
-
Mar 2023
One unit: kitchen remodel, bathroom remodel: update electrical: no structural change.
-
Apr 2024
One unit: kitchen and bathroom remodel. electrical upgrade in the unit.
-
Feb 2025
Replace damage decking and stair threads on rear stairs approx 10%. repair any dry rot where neccesary. to comply with nov #2025-33132 #4.
3 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Nearby
- 199 Gough Street Same street
- 225–235 Gough Street Same street
- 230 Oak Street Same block
- 248–250 Oak Street Same block
- 221 Oak Street Around the corner
- 265 Oak Street Around the corner
- 150–180 Oak Street Around the corner