511–529 Hayes Street
Hayes Valley · San Francisco, CA 94102
Permit history
-
Oct 1989
Reroofing.
-
Oct 1994
Parapet work.
-
Apr 1996
Reroofing.
-
Feb 1999
Siesmic retrofit.
-
Mar 2000
New handicap toilet, sheetrock walls, plumbing, one toilet, one sinks, separated electrical permit.
-
Sep 2001
Revision to permit application 9611079.
-
Jan 2002
Interior tenant improvement new upgraded restroom fully compliant. partition walls replace storefro.
-
Nov 2004
"site permit" to re configure closed restaurant into new restaurant.
-
Nov 2004
Interior renovation including new mechanical, electrical, & plumbing. new h.c. accessible entry.
-
Apr 2005
Installation of kitchen hood type i system. 3'0 hood & make up aircooler. ref #.
-
Aug 2005
This prmit covers field changes to reconfiguration of closed restaurant into "patxi's pizza" rest.
-
Nov 2005
Erect electric single faced wall sign.
-
Dec 2013
Restaurant renovation for new tenant. kitchen renovation, no exterior work.
-
Mar 2014
Install ul300 fire system to protect kitchen hood and cooking equipment. ref app#201312174411.
-
Jun 2014
Plate glass storefront windows replaced with custom plate glass windows in existing window frames, remove security grille and remove metal and paint wood casing. install framed screens (to be removed when windows are closed).
-
Jul 2014
Plate glass storefront windows replaced with plate glass windows in existing window frames.
-
Sep 2015
Erect aluminum logo sign - not illum.
-
Apr 2016
Replace existing lighting fixtures & add new fixtures, new take out store front winodw. new banquetts seating, new inteiror screens, new service counter, new take out counter with electrical.
-
Jul 2017
Remodeling an existing retail space: new light fixtures and minimal electrical work. new product storage room & kitchenette. new storefront. bathroom remodel.
-
Jan 2020
Comply with nov 202011711 - existing small restaurant renovation - interior tenant improvement. new flooring, new wall finishing. renovation to mechanical ducting. no exterior work.
-
Jun 2021
T.i.: new partitions, finishes, lighting, plumbing. selected replacement of storefront windows. new interior wall opening to connect 2 retail spaces and partial lowering of floor at 525 hayes. no increase of area, existing accessible restroom to remain.powered door operator. proposed per sfbc da-04.
-
Oct 2021
Install one non-illuminated duble-faced projecting sign.
-
Oct 2021
Install one non-illuminated single-faced wall sign.
-
Nov 2021
Revision to permit 202106253257. work to include mechanical hvac, electrical distribution, and structural replacement of storefront curb. no change to floor area, occupancy, exit path, or accessibility features.
DBI holds 40 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 40. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update