742–744 Hayes Street
Hayes Valley · San Francisco, CA 94102
-
1890
Built.
-
Apr 1994
Install vinyl siding to entire house.
-
Jun 1997
Rebuild the external stairs to same.
-
Sep 2003
Repair deck & stairs. change to the dry rot & 4x4 post change.rapairs or change to the railing.less.
-
Oct 2003
Repair existing carport and stair perrequestby building inspectior (in kind)revision to 200309306151: req.
-
Jun 2007
One unit: remodel kchn and bathroom. replace cabs/fixtures/refinish floors. one unit: remodel kchn and bathroom. replace cabs/fixtures/refinish floors.
-
Jul 2007
One unit: add bathroom/relocate washer/dryer. one unit: add bathroom/relocate washer/dryer. ground floor add toilet room.
-
Jul 2008
Voluntary structural upgrade on a 2 unit building as per plan, adding 3 story moment frame with new grade beam, strengthening chimney foundation adding post bases e caps.
-
Jul 2008
Rebuild exisitng fence & gate @ rear property line. remove concrete step, prepare existing grade @ rear for new concrete slab on grade ( approx 25' x 15'). inkind. replace retain wall @ property line - if req.
-
Sep 2008
Revision to 200807217208, new retaining wall at west property line and at rear ivy street side, 3' max.
-
Oct 2008
Revision to permit application 2008-0721-7208-remove gate & fence at ivy street side from scope of work.
-
Feb 2015
Abatement of unwarrented dwelling unit at the ground floor with removal of existing kitchen. existing half-bath at ground floor to be legalized. first floor will not contain any habitable space.
-
Mar 2015
To comply with physical inspection report #cc-7682. n/a maher ord. # 155-13.
-
Apr 2015
(6) windows replacement, like for like. 2nd floor only. double glass, wood clad, not visible from street. u factor is 0.40. wood clad -5, vinly -1.
-
Apr 2016
New interior stair from ground level to the 2nd level to connect the 2 existing finished spaces. legalize & remodel existing ground floor to full bathroom from 1/2 bath. add utility sink in existing storage room on ground floor per plan. n/a maher ord. 155-13.
-
Jul 2016
Conversion of existing finished ground floor storage space to habitable space - add 1 bedroom and 1 media room. maher na.
-
Mar 2017
Cosmetic remodel of existing kitchen. no wall removal or relocation maher na.
-
Jan 2019
Bathroom cosmetic remodel, existing bathroom with new tiles, fixtures.
-
Feb 2022
Kitchen remodel. no structural change. replace cabinets, countertops, appliances, lighting and sink in one unit only.
5 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Nearby
- 686–690 Hayes Street Same street
- 840–842 Hayes Street Same street
- 745 Buchanan Street Same block
- 724–726 Buchanan Street Around the corner
- 581 Ivy Street Around the corner
- 575–579 Ivy Street Around the corner