22–52 Waller Street
Church · Hayes Valley
-
1909
Assessor’s “built” date.
-
August 28, 1909
Potter & Vogt contracted for excavation and concrete on a brick and stone church for the First Baptist Church, at $7,244.
-
April 2, 1910
The First Baptist Church's new building was nearing completion outside: about $70,000, with a dome rising 90 feet above the sidewalk and an auditorium for about 1,200.
-
Oct 1991
Parapet bracing.
-
Jul 1993
Horizontal addition.
-
Sep 2004
Reroofing.
-
Jun 2007
Reroofing.
-
Oct 2008
Replace existing rear staircase due to damaged by fallen tree to meet accessibility requirements. add one van accessibility parking space.
-
Apr 2009
Tenant improvement: construct new non-structural bearing walls, new decking and new canopy @ breezeway. add new lighting fixtures, new restrooms fixtures (for children's use) & replace existing gas furnace. sprinklers under separate permit.
-
Apr 2009
Tenant improvement: construct new non-structural bearing walls new deck & canopy @ breezeway. new restrooms & new lighting & plumbing fixtures. sprinklers permit under separate permit.
-
May 2009
Provide new automatic fire sprinkler for existing building.
-
May 2009
Provide new automatic fire sprinkler for existing building.
-
Sep 2012
Reroofing.
-
Jan 2016
Ti include lighting, mep, parking lot and accessibility improvements.
-
Jan 2016
Ti of existing church building including installation of new platform lift between floors. work includes reconfiguration of floors, new fixtures, new finishes, voluntary structural strengthening. n/a maher ord. 155-13.
-
Jan 2016
Installation of 2 new accessible parking spaces, new 2% max ramp with hand rails. platform lift under separate permit.
-
Jun 2016
Add 7 upright sprinkler heads. add 4 pendent heads, relocating 30 pendent ref pa 2016 0107 6603 maher na.
-
Jul 2016
Relocate 8 pendent at 1st floor. add 14 upright heads at 2nd floor roof level. ref app#201601076606. to comply to complaint #201616173. n/a for maher.
-
Dec 2016
Renovations in basement of workshop bld. work includes upgrade if bathrooms & drinking fountains to ada compliance, new moveable partition wall, new finishes, no exterior work. fire protection under sep permit maher na.
-
Aug 2019
Reroofing.
-
Feb 2025
Convert existing daycare from occupancy e to i-4 to care for children under 3 years old. convert one kids restroom to an adult restroom. provide additional ventilation and per health code article 38.
-
May 2025
Partial reinforcment of existing dome windows. all work is in kind, no exterior work.
DBI holds 50 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 50. 5 of them are nominal $1 street-space or sidewalk permits. 6 expired permits are not shown. The assessor's roll gives 1909; this address is recorded as built 1900.
Nearby
- 58 Waller Street Same street
- 41 Octavia Street Same block
- 119 Haight Street Same block
- 80 Waller Street Same block
- 155 Haight Street Same block
- Carmel Fallon Building Around the corner
- 1815–1819 Market Street Around the corner
- 133 Mccoppin Street Around the corner