336–350 Judah Street
34-unit apartment building
-
1926
Built.
-
1928-1929
Built 1928-1929. Architect: H. C. Baumann. Builder: Cox Brothers (Edward, Ward and Roy Cox). The firm's most ornamented building of its third (1921-1928) phase.
-
Jun 1984
Install awning.
-
Apr 1997
Construct cellular telecommunications facility-12 panle ante.
-
Jul 2002
Add 4 non bearing walls, food service equipment & cabinets, electrical. & plumb for equipment.
-
Aug 2002
Tenant impvement for new retail store with beverage counter, work includes new millwork, finishes, pain.
-
Sep 2006
Existing antenna on zero lot line per city requirment antenna being moved to roof top ariginal permit app#200005180325. complain #'s 200341047, 200561365 & 200672494 no penalties due @ this filing.
-
Dec 2014
Modification to e tlecom att facility consisting of remove and replace 3 e antenna with 3 new antennas. emove all unused coax. remove 2 e unused rbs 2206 gsm cabinets, replace e dul with new dvs, install 3 n rrus-12 with a-2 modules.install 3 fiber winder boxes, relocate e gps units vertically lower.
-
Jul 2015
Remodel #403 at 5/f- relocate & remodel existing kitchen, add washer and dryer.
-
May 2016
One unit: remodel at the 5th floor, remodel existing bath, relocate existing kitchen, convert existing kitchen to bedroom, add washer/dryer.
-
May 2016
One unit: remodel one unit at the 3rd floor, remodel existing bathroom, relocate existing kitchen, add washer & dryer.
-
Jun 2016
Remodel #206 at 3/f: remodel existing bathroom, relocate existing kitchen, add washer & dryer.
-
Aug 2016
Remodel one unit, 4th floor - remodel existing bathroom and kitchen. relocate existing kitchen, relocate bedroom and add washer/dryer.
-
Oct 2016
At&t mobility modification: remove & replace (9) existing antennas with (9) new antennas; relocated 2existing antennas on 2new antenna mounts; relocated 5existing antenna mounts; install 6new rrus near antennas; remove and replace 3existing rrus-12 with 3new rrus-32; install other equipment in equipment room.
-
May 2018
Reroofing.
-
Jan 2019
One unit - convert existing kitchen to bedroom. relocate kitchen, rehabilitate existing bathroom. install washer/dryer. maher n/a.
-
Apr 2019
Upgrade existing fire alarm to comply with sffc 1103.7.6.1 & nfpa 72.
-
Nov 2019
One unit: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer & dryer.
-
Jan 2020
One unit: 1) convert existing kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate existing bathroom. 4)install washer and dryer.
-
Jan 2022
G/f: commericial tenant improvement - interior renovation from existing bakery to new restaurant.
-
Feb 2022
At&t: modification of an unnamed telecommunications facility: remove+ replace 6 panel antennas. 1 new 12" pipe to pipe extension. 1 new dc 9 box, 1 dc power trunk, 1 fiber trunk. remove existing power plant & install new 7100 dc power plant. 12 new rectifiers, 1 new battery puck. 1 new 6648 baseband unit.
-
Jul 2022
#306, 4/f: convert existing kitchen to bedroom. relocate kitchen. rehab existing bathroom. install washer and dryer.
DBI holds 68 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 68. 5 of them are nominal $1 street-space or sidewalk permits. 5 cancelled permits are not shown.
Nearby
- 326 Judah Street Same street
- 521 Judah Street Same street
- 1386–1388 9th Avenue Same block
- 320 Judah Street Same block
- 1391 8th Avenue Same block
- 1366–1368 Ninth Avenue Same block
- 1385–1399 Ninth Avenue Around the corner
- 1407–1411 Ninth Avenue Around the corner