1601–1625 Post Street
Japantown · San Francisco, CA 94115
-
Nov 1984
Install chemtron system in basement.
-
Jul 1985
Add restaurant & kitchen between hotel & building at post st.
-
May 1986
Remodel kitchen, revision to p.a. #8507272.
-
Sep 1988
Demolition, build new partition walls, upgrade mechanical, electrical, plumb.
-
Jan 1991
Alterations to existing hotel restaurant, relocate bar, kitchen.
-
Mar 1991
New port cochere canopy entrance, new masonry planter.
-
Apr 1993
Renovat of 7 guest suits in annex portion of miyako hotel.
-
Jan 1995
Replace air conditioning chiller in basement with smaller unit.
-
Mar 2000
Remodel of existing restaurant soft demolition install accessible ramp accoustic ceiling soffit partition tread.
-
Aug 2007
Inerior non strutural partitions furring and portron of new ceiling demolition/remove existing non strutural partitionsm furnature, lightf features, exist stair, ramp. revise existing out to new layout. new wheelchair lift, new finishes-flooring, paint, etc.
-
2009
Recorded in the city's 2009 survey of Japantown as the Kabuki Hotel, one of the redevelopment-era hotels built near Japan Center and Buchanan Mall in a Japanese-inspired modern style.
-
Oct 2009
Construct 1 l shaped pond sculpture. construct 1 fish pond sculpture. millwork at bathroom, fire retardant millwork entry feature, all are cosmetic details. 1 roof feature on seperate permit.
-
Dec 2011
Installation of a wireless telecommunication facility consisting of 12 antennas & 7 equipment cabinets.
-
May 2012
Reroofing.
-
May 2015
Reroofing.
-
Oct 2015
Expand fitness center to replace meeting rooms, increase square footage from 395 sq ft to 2850 sq ft.
-
Nov 2015
Demolish mezzanine level above lobby, decrease sq. footage and occupant load. total is 1, 206 sq ft 121 occupant load is reduced. mep, life safety deferred.
-
Dec 2015
Fire alarm system like for like system replacement per sffd approved plan of action, 1 facu upgrade, 7 transpondere upgrade, 1 led annuncciator, 1 voice panel, 55 pulls, 61 smokes, 2 heats, 21 duct smoke with replay.
-
Feb 2016
Renovation 156 existing guest rooms and common space such as corridors from level 4 to 16 in the tower only. no square footage is added. total proposed work is 70, 368 sq ft occupant load is unchanged. separte mep permit.
-
Mar 2016
The scope of work for the annex building involves renovation of existing guestrooms & common areas. there will be 7 new rooms added to the existing structure but no square footage will be added or alterated.
-
Mar 2016
The lobby & garden levels involves adding a pantry, a bar & two unisex restrooms. it will also demolish the existing stairs by the entry.
-
Nov 2016
Fire alarm t.i. to tower guest rooms. 2 power supplies, 40 smoke detectors, 13 sounder base smokes, 26 strobes, 52 speaker/strobes, 156 speakers. ref app#201602190034.
-
Mar 2018
Replace like-for-like: speakers, speaker-strobes, smoke sensors with std base and with sounder base in hearing impaired rooms; strobes in hi rooms, remove& cover existing horns in corridor, work is confined to guest rooms & corridors, ref 201512185528.
-
Jun 2018
Interior remodel of an existing restaurant, new configuration of mezz & 1st floor with occupant loads, new type i hood and fan, new teak wood rated class b and new stairwell to mezz. sffd assembly permit req.ul300, sprinklers, fire alarm sep/permit.
-
Sep 2018
Ground floor mep t.i. for restaurant. ref permit application 201806252835.
-
Feb 2025
Front of the building t-mobile: remove 3existing antennas + 1existing cabinet, install 6new antennas within 3new frp screens, instal 2new, install 12new batteries <70kwh + <50 gallons electrolytes, relocate existing electrical tric panel, install new meter.
DBI holds 121 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 121. 16 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update