1450 Post Street
Japantown · San Francisco, CA 94109
-
1957
Photographed, showing the San Francisco College of Mortuary Science.
-
Nov 1981
Additions alterations or repairs.
-
Apr 1990
Construct food preparation facility.
-
Apr 1991
Remodel existing apartments.
-
1992
Built.
-
Aug 2007
1st floor-common area renovation. installation of new finishes, fixtures, doors, appliance, mechanical and electrical wk. life safety and sprikler work will be under separate permit.
-
Jan 2008
2nd, 3rd, 4th & 6th floors: one unit renovation of an existing unit, 309, 310, 311 converting to wellness/fitness suite, two units combining to one unit, two units to combining to one unit two units combining to one unit. sprinklers under separate permit.
-
Feb 2008
Revision to appl #200801112327: 2nd, 3rd, 4rd and 11th floors, two units combining to 215; two units combining to make 315; two units combining to make 415; three units combining to make 915; two units combining to make 1115. sprinkler under separate permit.
-
Feb 2009
Fire alarm system upgrade- replace existing facp, replace all existing initiating devices with new on one-for-one basis. add addit'l smoke detectors to common area corridors, fl. 2-12. replace existing speaker strobes one-for one.add new to elevator lobbies, 2-12. remove existingdual monitor mods and replace with 2 new iams.
-
Jul 2010
One unit: all work to be performed in one unit; replace cabinets in both bathrooms and kitchenette. installation of new faucet and new remodel existing toilets same location. build wall to create office. installation of new recess lighting in office.
-
Aug 2013
Reroofing and removal of "mangard" roof structure. strenghening of parapet and addition of safety railing. also see attachment.
-
Sep 2017
#308- interior remodel of one unit. relocate the existing kitchen, replace existing bathtub with a washer/dryer, new layout to non load bearing walls at closets and new kitchen area. sprinkler, alarm deferred.
-
May 2018
Emergency cladding repairs to building's east west & south elevations. repairs include removal/replacement in kind of efs exterior sheating and damaged metal framing. existing balcony wind enclosures shall be replaced in like kind.
-
Feb 2019
One unit. remodel unit incl upgrades. relocate kitchen, relocate and remodel 1 bathroom, create 1 new half bathroom, build new room, build new den.
-
Jul 2019
One unit - remodel both bathrooms and kitchen. upgrade electrical @ kitchen area; new vanity sinks, shower re-build. add 6 new sconce lights.
-
Jul 2019
One unit - remodel both bathrooms and kitchen. upgrade electrical @ kitchen area. new vanity sinks, shower rebuild, add 7 new wall scones lighting. no removal of walls.
-
Jun 2021
Complete one kitchen and one bathroom remodel. kitchen outlets. new shower valve. new tile work and flooring. new paint job.
-
Apr 2022
9/f-one unit: interior renovation with existing resident, alterations to existing nonload baring interior partitions; repairs to interior finishes @ walls, ceiling & toilet rooms, associate mep work.
-
Apr 2022
8th floor: one unit: the scope of work is limited to interior renovations with in an existing resident #806. the work include alterations to existing non-load bearing interior partitions, repair to interior finishes at walls, ceiling, & toilet rooms, & associated mep work.
-
Apr 2022
One unit: interior renovation. alteration to existing non-load bearing interior partitions. repairs to interior finishes, wall, ceiling, and toilet rooms, and associated mep work.
-
Apr 2022
One unit: interior renovation. alteration to existing non-load bearing interior partitions. repairs to interior finishes, wall, ceiling, and toilet rooms, and associated mep work.
-
May 2022
One unit: (1) kitchen remodel, (1) bathroom remodel, install (1) new wall sconce, new lighting, new cabinets, new flooring, fresh paint.
-
May 2022
One unit: (1) kitchen remodel, (1) bathroom remodel. relocate subpanel box, wall sconces (2), new flooring, new fresh paint job.
-
Jun 2022
One unit: (1) kitchen remode. (1) bathroom remodel. install (2) new wall sconces, new lights, new cabinets, new flooring, new paint job. remodel in-kind, no layout change.
-
Nov 2022
One unit: (1) kitchen remodel and upgrade; remodel (2) bathrooms, new wall sconces, new flooring, new fresh paint.
-
Mar 2023
(2) full bathroom remodel upgrades, (1) kitchen full remodel: new flooring, fresh paint, (3) new lights. no changes to layout and structure.
-
Mar 2023
(1) full kitchen remodel with upgrades. (1) full bathroom remodel new flooring, fresh paint, 2 new lights. no changes to layout and structure.
DBI holds 186 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 186. 17 of them are nominal $1 street-space or sidewalk permits. The assessor dates the building to 1992, after this photograph was taken.
Nearby
- 1161 Post Street Same street
- 1601–1625 Post Street Same street
- 1407 Gough Street Same block
- 1333 Gough Street Around the corner
- 1550 Sutter Street Around the corner
- 1500 Sutter Street Around the corner