1333 Gough Street
Japantown · San Francisco, CA 94109
-
1966
Cathedral Hill Plaza, designed by Daniel, Mann, Johnson & Mendenhall for the Western Addition A-1 redevelopment area — a fourteen-storey apartment tower set on a parking plinth, with tennis courts and an indoor pool above the garage.
-
Mar 1983
Additions alterations or repairs.
-
Mar 1987
Entrance remodel non-bearing interior partitions.
-
Jul 1987
Health club-remodel of recreational facility.
-
Feb 1989
Install fire dampers.
-
Sep 1994
Reroofing.
-
Apr 1999
Ada/title 24 accessibility upgrades to health club.
-
Apr 2000
Replacement of existing fire alarm system.
-
Nov 2012
Remove & replace emergency generator located on level one work includes construction of 2-hr fire rated wall to enclose generator. generator with 220 gallon skid tank.
-
Nov 2012
Reroofing.
-
May 2013
Kitchen & bath remodel one unit; to comply with complaints 201305281, 201152616, 201398161, 201398151; no alteration of partition wall, no structural work.
-
May 2013
Three units: kitchen & bath remodel in each unit. no structural work.
-
Jul 2013
Bathroom and kitchen remodel - 3 kitchen, 3 bathroom, no structural & same location for one unit, penthouse unit l and 6h.
-
Sep 2013
One unit: replace counter tops kitchen lighting plugs bathroom and kitchen fixgtures. no structural work.
-
Nov 2013
Seven units - replace counters at kitchens and bathrooms. to comply with cec150(k) 8 & 10.
-
Jun 2014
One unit. remodel of old counters, install new ones in kitchen/bath.
-
Aug 2014
New room for emergency generator at ground floor maher not required-155-13.
-
Sep 2014
Removal of counters, install new ones in kitchens & baths. #12d -kitchen & 2 vanities. phn -kitchen & 1 vanity & #3j- 1 vanity only. n/a ordinance #155-13.
-
Jan 2015
Removal of counter tops only. innstall new corian ones in kitchen and baths(no cabinet and other work). one unit: kitchen, one bath, lavatory counter top and sinks. one unit: kitchen counters, one unit kitchen and 2 bath lavatory counter top and sink only.
-
Feb 2016
#1e, 6f & 5k- kitchen and bath vanity, counter tops, replacement only for each unit, total of 3 units. no other work. n/a ordinance #155-13.
-
Feb 2016
Sprinklker t- in first floor- add 4 fire sprinkler heads @ emergency generator room, level 1. ref pa 2015-1107-2715. maher na= flow switch separte permit.
-
Nov 2016
Units: 10g, 6e, 2b, 4j - kitchen and bath vanity counter top replacement for each unit. total 4 units; n/a maher ord. 155-13.
-
Aug 2018
Evac maps replacement - total of 42 signs for all floors.
-
Jul 2019
One unit remove 21--8" linear feet of walls in living room to restore unit to original configuration.
-
Feb 2023
Strengthening of existing concrete joist with the reinforcement of a steel beam assembly. patching of concrete spalls.
-
Jan 2025
Upgrade fire alarm system to voice evacuation, add new speaker in all bedrooms and living rooms. replace facp and all slc devices with new.
DBI holds 45 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 45. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer, the early residents and the date of the last recorded sale. Submit an update