1111 Gough Street
Western Addition · San Francisco, CA 94109
Permit history
-
Jul 1987
Remove existing platform & stairs.
-
Jun 1990
Construct new access ramp on lower level.
-
Mar 1991
Isntall hang rail to permitted handicap access ramp.
-
Aug 1994
Remove doors, provide in fill 1h stud partition & fin with marbl.
-
Apr 1996
Demolition of non structural partitions, book store elevator.
-
Jun 1996
Reroofing.
-
Apr 1997
Fire alarm stobe & smoke detector/work done under #9606821.
-
Oct 1998
Erect one story trash enclosure.
-
Jun 2001
Conversion of existing maintenance, storage facility into parish hall facility.
-
Mar 2002
Ewlocate 22 sprinkler heads and add 4. all work in gough st level.
-
Sep 2006
Replace jobsolete kitchen hood.duct fire system @ ground floor only.
-
Jun 2007
Suppression sys./ fire alarm tie-in basement level.
-
Feb 2010
Construction of dressing rooms and toilet facilities. this work connected to scope of work under permit application #2008-0818-9440 at address 1100 ellis st. block 0711, lot 031.
-
Jul 2013
Lighting control repairs. add emergency lighting to main floor level. add emergency generator in the basement.
-
Apr 2016
Fire alarm - voluntary one for one replacement of existing fire alarm system. adding 1 smoke detector to protect facu & 1 communicator to transmit signals & 1 monitor module to monitor exisitng sprinkler system. no associated building permit.
-
Nov 2024
Ti to include interior barrier removal and code upgrades including new lift platform, stair hand and guardrails.
-
Apr 2025
1/fl- ti 202411044337- relocate 4 sprinklers.
-
Dec 2025
Cahill plans to anchor sculpture on the existing exterior plaza of st. mary's cathedral church at gough and geary streets. sculpture will attach to deck via anchor bolts through existing concrete waffle slab.
-
May 2026
Drilling through diaphram of plaza/cross baseplate to install a sculpture. there will be no modification to the structure of the cathedral building & plaza other than the sculpture's attachment to concrete deck. sculpture will be anchored on the existing plaza of the st. mary's cathedral at gough & geary.
-
May 2026
Remodel of (3) existing restrooms.
Not yet documented: the developer, the early tenants and the date of the last recorded sale. Submit an update