73–85 Arkansas Street
Mission Bay · San Francisco, CA 94107
-
1923
Built as a furniture factory.
-
Apr 1994
Comply with parapet ordinance.
-
Feb 1995
Seismic retrofit and parapet bracing.
-
Jul 1995
Interior t/i for a graphic arts office new walls & ceiling.
-
Sep 1995
Fire sprinkler renovation.
-
Nov 1996
New exterior loading dock and ramp, modification entry doors.
-
Feb 1997
Fire sprinklers.
-
Apr 1997
Monitored fire alarm.
-
Nov 2007
Build an ada bathroom and install all appropriate plumbing per barrior removal.
-
Jun 2016
To erect 4 stories, type va, 30 units student housing with mixed use building. ** maher: n/a **.
-
Nov 2016
Demolish (1) story industrial building.
-
Dec 2017
Underground fire sprinkler supply. ref app#201606281077 (s) n/a for maher.
-
Jun 2018
Install 10x12 ft sign, non electric single faced sign on existing canopy over main entry door. (california college of the arts).
-
Feb 2021
Sales center for new construction at 88 arkansas street project. new interior non-structural tenant improvements (interior partitions & finishes) on ground floor of existing 4-story building.
-
Apr 2021
Two spaces are being combined into one, work includes building (2) fully accessible restrooms and ramp with bridges existing 14"difference in floor elevation between spaces.
-
May 2021
To replace the bda head end unit to comply with the sq ft errcs frequencies, as well as replace the donor "roof" antenna. all other components remained unchanged.
-
Jul 2021
T.i. of an existing commercial space in a building with an existing gamewell/fci s3 fire alarm system: adjust height of existing notification appliances as necessary to avoid ceiling obstructions. new audible and visual occupant notification devices in new restrooms using existing raceways.
-
Jul 2021
To install 2 sprinkler heads. ti ref. permit application 202104239259.
-
Aug 2021
To add sprinlker heads to remodled area fromexisting new sprinkler system. 8 total heads. ref pa202107305475. ref t.i. pa202104239259.
-
Nov 2021
Title 24 compliance: rough-in and installation of receptacles, switches, lights fixtures and one electrical panel. ref to permit application 2021 0204 4017.
-
Feb 2022
Voluntary t.i. of existing commercial space with existing gamewell/fci s3 fa system. new audible & visual notification devices in tenant area per code.
-
Jun 2022
Interior only alteration to suite #4: accessible restroom, office kitchenette, storage and exhibit studio. mep is deferred.
-
Jan 2023
Space 4: lighting title 24 only. ref permit 202206136153.
-
Mar 2023
4/f: new audible/visual occupant notification devices will be provided in the ti areas per code, 1-smoke detector is provided to be installed above new rds.
-
May 2023
2 new control relays for elevator battery lowring equipment for 2 elevator cabs.
DBI holds 37 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 37. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early residents. The assessor dates the building to 2018; the city's 2011 survey of Showplace Square and the northeast Mission dates it to 1923. Submit an update