105–185 Berry Street
Mission Bay · San Francisco, CA 94158
-
May 1981
Additions alterations or repairs.
-
Nov 1993
Erect wharf.
-
Nov 2000
One-stop/c.hom: remodel existing office space into equipment room on 1st fl.
-
Dec 2003
Tenant improvement at 1st floor and lower level. work includes installation of new walls/doors/floor.
-
Nov 2005
Add 2 levels 150, 000 sq ft core shell space above an existing 3 story building. addition to be supported on base isolators on existing roof. the addition & existing building wil be separated by an interstitial space housing base isolation structure & existing building equipment.
-
Aug 2011
Work @ 4th & 5th floor only. upgrade existing struture (interior) from "cold shell" to "warm shell" work includes new restrooms, closets & mep infrastructure & systems. ref permit application 2005/11/30/9232. no change in use; existing use to remain office/research and development.
-
Aug 2011
Tenant improvement, new partitions & finishes, new doors, cabinetry & appliances, new showers including accessibles stalls. mep under separate permit.
-
Dec 2011
5th floor: interior alteration including drywall ceilings, doors, glazing, millwork and finishes and associated mechanical and electrical.
-
Dec 2014
Suite 3400, office renovation include constructions of walls and ceilings. tenant improvement, demolition mep and fire sprinkler under separate permit.
-
Mar 2015
5th floor office t.i. including offices, conference rooms and breakrooms. demolition, mep under separate permits. maher n/a.
-
May 2016
4th floor: demolition under separate permit #2016-0518-1183. construction of new walls/partitions, millwork, doors, glazing and finishes on 4th floor tenant space. existing food service area to remain with upgrade. mep, sprinklers and life safety under seperate permit. n/a for maher.
-
Aug 2016
1st/3rd floors: #129 & #325: a/mep 1st floor (#129): modify existingmri room to accommodate new mri equipment, upgrade mep; 3rd floor(#325) add swiss log station, add pneumatic tube system. fire and life safety under separate permit. maher ord 155-13 na.
-
Aug 2017
2nd floor: t.i. to demolition and construct new partitions, doors, millwork, finishes, ceiling, all gender rest room and mep. fire alarm and sprinkler on seperate permit. n/a for maher.
-
Oct 2017
(roof / building) construct an expansion to existing mechanical penthouse to accomodate the pumps for new cooling towers & part of central plant upgrade for building. new mechanical penthouse will be same hight as existing mechanical penthouse. ** maher: n/a **.
-
Feb 2018
Tenant improvement on 4th fl to include new partitions to create conference rooms, pantry and open office areas. mep includes life safety, fire sprinkler sep permit maher not req.
-
Feb 2019
Suite 400. tenant improvement incl construction of open office conference rooms, team offices and storage. mep, life safety, sprinkler separate.
-
Mar 2019
Voluntary seismic upgrade of existing china basin wharfside building.
-
Nov 2019
Renovation of mccarthy cook management office and conference center. renovation of showrs for tenants, renovation of seating area of focaccia restaurant space. addition of bar at focaccia. removal and additoin of new doors at lobby 3 of wharf building and at main lobby at berry.
-
Apr 2020
Micropile elements of new foundation system. this is a deferred submittal from permit application 201903296675.**maher n/a**.
-
Nov 2020
Remodel and replacement of existing air handling systems includ associated electrical & support struct & footings. no site, landscaping, use or parking changes are proposed.
-
Apr 2025
Converting existing ground level office space into office amenity spaces and a public cafe. exterior work proposes new storefront entries, operable glazed doors, a cantilevered balcony improvements to existing wharf and associated seismic upgrades.
-
Feb 2026
Interior improvement for sierra, located on level 5 at 185 berry st. mep is included in the plans.
-
Feb 2026
6th fl: interior improvement for sierra in the wharfside of the building. approx 69, 918 sq ft.
-
Feb 2026
Interior improvement for sierra. located on levels 1 and 4 at 185 berry st in the wharfside building. the project is approximately 52, 134 sq ft.
-
Mar 2026
Ti for sierra located on levels 1, 5 & 6. selective demolition of portion of existing floor slabs at levels 5 & 6 to create 3 story, interconnected volume intended for "all-hands" assembly gatherings, work also includes construction of stadium-styled seating & associated stairs between level 4, 5 & communicati.
-
August 27, 2026
An ambitious waterfront restaurant from the restaurateurs known for affordable prix-fixe — The San Francisco Standard
DBI holds 1,293 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 1,293. 31 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update