1700 Owens Street
Office building
-
Dec 2004
To erect research and development in mission bay.
-
Mar 2006
Complete fire sprinkler system all 5 floors.
-
Apr 2006
4th floor - tenant improvement of 4th floor/1st time build-out for a "b" occupancy non educational lab/new partitions and m.e.p.
-
Apr 2006
Tenant improvements of partial 5th floor "b" occupancy lab/new partitions and m.e.p. build out of lab areas only (offices under seterate permit).
-
Apr 2006
Tenant improvement of 1st floor lobby area. new partitions(rated & non rated) and finish work.
-
Apr 2006
Oti-1, 5th fl, el, me, ls, sp. office areas (lab areas under seperate permit).
-
Jul 2006
Tenant improvement of 2nd floor. build out of offices and open "b" occupancy lab areas.
-
Oct 2006
3rd floor - tenant improvement of 3/f. new offices & open office areas. new "b" occupancy lab areas.
-
Mar 2007
Interior bio-tech tenant improvement on 2nd floor, new offices and lab areas.
-
May 2007
4th floor - revision to approved appl #200604068434. alteration of vivarium area on 4th floor. new showers and reconfigure cage wash area.
-
Sep 2007
Office tenant improvement on the 5th fl."synergenics" 1, 800 sq ft.
-
Nov 2007
New ground floor office marketing cneter & maintanence office. (6) new b occupancy storage (n o hazardous materials). no work in h3 or h8 occupancy. b occupancy work only. no exterior work. sprinkler & fire alarm under separate permit.
-
Apr 2008
Ground floor tenant improvement of 4, 027 sq ft "b" occupancy office space for m.s. society of northern ca. new office partitions and m.e.p. no exterior work. sprinkler and fire alarm under separate permit.
-
Aug 2008
#125- construct new offices and "b" occupancy lab at tenant space. sprinkler & fire alarm under separate permit.
-
Jan 2010
Completion of 5th floor space including new partitions, ceilings, flooring, electrical, break room sink, hvac. approx 5000 sq ft fire sprinklers separate permit.
-
Jul 2011
Construction new deli, 1st time tenant. walls, ceiling, plumbing, mechanical.
-
Apr 2013
Modify gpy area to new breakroom - 4th fl chemical lab add new air turret - 4th fl convert part of lab to new cleanroom - 4th fl new inside fencing at hazardous storage room - 1st fl. fire alarm & fire sprinkler deffered.
-
Aug 2013
Modificaction to va 3rd and 4th floor office and labs. work includes mechanical, electrical, plumbing mops. new interior chan link fencing, walls and doors.
-
Nov 2014
2nd fl tenant improvement. minor modification to existing "b" occ. lab/office tenant improvements- mechanical'l, plumbing, & relacted electrical, interior wall modifications, add'l fumehoods, demolition of int. non. structural, walls to open up, offices, minor add'l accessiblity sinage. maher n/a.
-
Dec 2015
T.i. of an existing office and common area on the 5/f, scope of work to demolition 9e) offices to create open work space. n/a ordinance #155-13.
-
Jun 2016
Demolition existing cleanroom on level 4. new vivarium in its place - new process piping in existing chem lab, new process piping in converted storage to analytical lab. new fume hood in chem existing 2nd floor to receive new cold room inside existing mecn space. maher na.
-
Apr 2017
Installation of nitrogen generator into existing 2nd floor mechanical room. includes structural anchorage and process piping. n/a maher ord. 155-13.
-
Sep 2018
Ti 0 existing lobby, construction includes new partitions, finishes, lighting, equipment & mezzanine. exterior ti of existing plazas construction includes new planters, ramps, steps & paving maher na.
-
Jul 2021
T.i. of existing labs/medical & offices on the 2nd floor. incuding demolition & installation of walls. ceilings, lab furniture, fumehoods, lab equipment & associated mechanical, plumb & ele changes. this project does not change occupancy & egress path of building.
DBI holds 179 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 179.