37.7700, −122.4095 A locator map appears here once a Mapbox token is configured.
Know This Place

District 6 · Block 3528, Lot 001 · ZIP 94103

530 10th Street

Industrial building

  • 3 stories
  • 105,178 ft2
  • 44,875 ft2 lot area
  • 2 residential units
  • 40 rooms
  • 18 bathrooms
  • Zoned SLI
  • Historic resource
  • Sold January 15, 2016
37.7700, −122.4095 Street View appears here once a Google Maps embed key is configured.
  1. 1927

    Built as an industrial building, concrete construction, recorded as occupied by Pacific States Electric Co. / McGuire Furniture. Engineered by the Pacific States Electric Co. engineering department.

    Showplace Square / Northeast Mission Historic Resource Survey, adopted 2011
  2. Dec 1985
    Permit 8514666 $$$ $988,000

    New construction.

  3. Apr 2016
    Permit 201604074223 $$$ $450,000

    Interior non structural demolition, flooring and walls, mep systems, manufactory equipment. building to remain vacant and comply with ab-0b17.

  4. May 2016
    Permit 201605127270 $$$ $800,000

    Voluntary seismic upgrade of reinforced concrete building @ 1201 bryant st; maher n/a.

  5. Jun 2016
    Permit 201606301320 $$$ $3,200,000

    Building interior alterations. work includes new bathrooms, elevator & core build-out. no change in area, use or occupancy classification. exterior work & barrier removal under separate permit. mep deferred.

  6. Aug 2016
    Permit 201608104687 $$$ $220,000

    Deferred micropile submittal, refrence structural drawing, application #2016-05-12-7270. scope of work: install 12 micropiles. maher ordinance 155-13 not required.

  7. Sep 2016
    Permit 201609238724 $$$ $126,000

    Replace sprinkler with new. replace existing 3/4" pipe with new 1" pipe. add floor control. valves. upgrade seismic sway bracing. ref building permit application 2016/06/30/1320. no exterior work. fire sprinkler work only. ** maher: n/a **.

  8. Nov 2016
    Permit 201611011655 $$$ $1,200,000

    Exterior renovations for barrier removal - new accessable entrance, removal of steel shed, lighting & exterior door & window repair & replacement. ** maher: n/a **.

  9. Feb 2017
    Issued Permit 201702149383 $$$ $1

    Deferred base building mep for 1201 bryant st. reference appln #201606301320 (architectural).

  10. Apr 2017
    Permit 201704063332 $$$ $40,000

    Replace portion of existing roof with new soprema 60mil pvc roof.

  11. May 2017
    Permit 201705307865 $$$ $25,000

    Structural shotcrete walls, at south portion of the building to thicken and stregthen existing structure where new openings are planned maher na.

  12. Jun 2017
    Permit 201706270479 $$$ $3,534,360

    First floor ti for automotive r & d/lab vehicle showroom/ staff dining area; support spaces include, pantry, single occupancy toilet rooms & conference room. mep, fire sprinkler; fire alarm under separate permit. ** maher: n/a **.

  13. Jul 2017
    Issued Permit 201707252859 $$$ $120,000

    1/f: mechanical & electrical work for t.i. ref permit application 201706270479.

  14. Jul 2017
    Permit 201707273121 $$$ $3,850,200

    2/f: t.i. new open office, conference roosm, a training room, a pantry area, vehichel operation center (voc), and restroom, mep deferred.

  15. Jul 2017
    Permit 201707273118 $$$ $210,000

    1/f: t.i. includes construction of exterior openings, structural modifications, garage rollling doors, temp guard rails & ramp. n/a maher.

  16. Aug 2017
    Permit 201708084273 $$$ $3,850,440

    3rd floor: t.i. to include new open office, conference rooms, pantry area, and restrooms. mep fire alarm, fire sprinklers under seperate permit. n/a for maher.

  17. Aug 2017
    Permit 201708225588 $$$ $3,403,680

    Ti on basement floor including new open office, conference rooms, work shops, no cooking pantry, mdf/server rm, bike storage, garage, restrooms. mep, fire alarm, fire sprinklers on sep permit deferred maher not req.

  18. Sep 2017
    Permit 201709188828 $$$ $547,560

    Roof- t.i. includes a lounge area and an exterior roof deck above 3rd floor. n/a ordinance #155-13.

  19. Sep 2017
    Issued Permit 201709219164 $$$ $500,000

    3rd fl: mep for ti. ref permit application 201708084273. maher na.

  20. Sep 2017
    Issued Permit 201709219159 $$$ $500,000

    Basement: mep for ti. ref permit application 201708225588. maher na.

  21. Sep 2017
    Permit 201709279725 $$$ $500,000

    T.i. includes construction of new interior communicating stairs(not egress stairs) and added roof beam and sleepers for future mechanical equipment. n/a for maher.

  22. Feb 2019
    Withdrawn Permit 201902122694 $$$ $245,000

    Addition of electric vehicle charging station toexistingparking lot. installation includes: (1)utility transformer, (1)400a service switchboard, (2) 2000a remote switchboards, (3)pedestrian lightpoles & fixtures, (3)lighting fixtures/wall mounted, (15)50kw terra abb ev chargers, (5)fusible disconnects.

  23. Jul 2020
    Permit 202007210568 $$$ $525,000

    Modify several rms located in basement, doors & relites. partial enclosures of central communcating stairs at basement level to create security barrier. stairs not egress. install prefab test chamber on 3rd floor. mep + f/a, sprinklers on separate permit.

  24. Nov 2023
    Permit 202311020041 $$$ $800,000

    1/f: strengthening of existing steel framing and open web steel joists to existing garage.

  25. Dec 2023
    Issued Permit 202312223063 $$$ $250,000

    3rd floor: installations of racks associated mep system and required structural anchorages in the hil lab space. roof-install vrf and package roof toop units.

DBI holds 83 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 83. 11 of them are nominal $1 street-space or sidewalk permits.