1155 Bryant Street
South Of Market · San Francisco, CA 94103
-
1919
Built as an industrial building, concrete construction, associated with Dunlop Tire Corporation.
-
Jan 1990
Ewo(s).
-
Jun 2006
Reroofing.
-
Apr 2011
Unmanned wireless facility consisting 12 panel antennas and associated equipment located in the interior of the building.
-
May 2014
A modification to an existing unmanned at&t telecom facility consisting of adding 3 new rrus-12 units with 3 new a2 modules and removing one existing dul unit and replace with one nw dus 41 unit inside an existing purcell cabinet.n/a for the maher ordinance #155-13.
-
Nov 2014
Barrier removal for ada accessibility. add 2 doors at street level and alter one door to meet accessibility requirements.
-
Dec 2014
New foundations per plan. n/a for the maher ordinance #155-13.
-
Dec 2014
Remodel, retrofit & ada upgrade to include: remove existing wood framed offices + storage, add (2) new floors (3 total).add elevator, egress stair, new internor stai, remove existing exteirior siding covering existing exterior windows, add bathrooms. change construction from type v to iiib. ** maher: n/a **.
-
Jul 2015
Install new fire control unit ifp-100 in lobby on 1st floor. smoke det. above & pull station near panel. notification appliances will be in stall thru-out floor area. install relay modules for elev. recall.. ref permit application 2014.1121.2278. n/a maher ordinance.
-
Oct 2015
Floors: 1, 2&3: fire sprinkler system 151 sprinklers, apn. 201412234406; maher n/a and 4" underground.
-
Oct 2016
As builts to 201507131316. install monitor modules to tie in 5 duct detector to exist panel. install relay and monitor module for shunt trip. install heat detect elev machine rm maher not req.
-
Nov 2018
At&t - r&r 12 antennas. install 9 new rrus, r&r 3 rrus. remove unused equip. remove 2 existing strings of batteries.
-
Jan 2019
Ref permit application 201412234406 new exhaust fans, new heat ppump unit, new fan coil units, new ductwork. title 24.
-
Jan 2019
Install additional sprinklers on 1st fl to accomodate new lab area framing changes off existing fire sprinkler system. re f 2014-12-23-4406.
-
Jan 2019
Change-of-use/change-of-occupancy: from manufactory (f1-occ.) to lab suite (l-occ). provide new lab space and clean room areas, all on the 1st floor. n/a for maher.
-
May 2021
Att: remove 3 existing antennas, remove 3 existing rrvs, install 3 new antennas, 3 new rrus; install 3 new surge suppressors, remove 1 existing cabinet & install 2 new cabinets, install new batteries.
-
Aug 2021
Renovate prototyping space, lab space, food research lab space & related prototyping. work at 1/f & 3/f. 2/f existing to remain. special equip installation interface details are required for this project. account furnished equip, e.g. lab benchwork & furnishings. special equip rm, wash equip, autoclaves.
-
Oct 2021
Interior work only: renovation @ 1st and 3rd fl. adding a few non bearing walls, mep under separate permit. fire alarm/sprinklers under sep permits, if applic.
-
Oct 2021
Revision to app#202110140490 structural review only for sump pump and ac unit with mechanical curb detail added to roof.
-
Oct 2021
Fire alarm: new power supply installed on 1/f and new notification devices througout floor rea on all floors. new devices will be tie-in to existing control panel. ref 201507131316 & 202110140490.
-
Nov 2021
Title 24 compliance: mechanical work. remodel 2 floor with new roof equipment with 5 new fan coil zones and 2 existing exhause zones. new overhead ductwork and diffusers. ref t.i. permit application 202110140490.
-
Nov 2021
1/f: relocate 23 pendent heads, add 2 dry pendent heads. ref t.i. pa202110180658.
-
Jan 2022
(12) evacuation signs - interior. 1/f-3/f.
-
Mar 2022
Mod cell site: r/r 6 antennas, 3panel, 3 air antennas; r/r 2 radomes.decom umts unit, remove 2 strings of 155ah batteries.remove 3 strongs of 155 batt from existing rba-72 dcpp cabinet.install 2 new strings of 1900ah batteries in existing inflight cab & 3 190ah in rba-72 cabinet.
-
Aug 2025
Att modification of existing faciilty. remove and replace (6) antenna, install (3) dc 9 raycaps, (3) 24 pair fiber trunks, (6) 6 awg dc power trunks, remove (1) power plant and (6) rectifiers; install (1) net sure conversion kit power plant. (1) 58v buss bar panel, (12) 18v rectifiers, (11) 58v.
DBI holds 35 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 35. 4 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update