1931
Built as an industrial building, recorded as occupied by Challenger Butter and Cream Assn.
-
Dec 1996
Install new bathrooms.
-
Dec 1996
Interior improvement erect stud walls.
-
Jan 1997
Revision to permit application 9624464 for new studwall.
-
Dec 1998
Correct accessible ramp/install restroom signs.
-
Aug 1999
Provide new accessible entry to replace existing new parking.
-
Sep 1999
Replace wood floor & frame for new acc/ramp rev.permit application 9916405.
-
May 2000
Add a floor and a small rooftop penthouse to existing office building add add'l set of stairs & new elevator.
-
Jan 2008
Ti on 1st and 2nd floors. remove some non-bearing partitions and install new partitions and doors. new accessable restrooms, new signage, handrails and striping.
-
Mar 2008
Install 4 new heat pump system on 2nd floor t.i.
-
May 2008
Revision to application 200801303587. install new motor @ 1 of the 3 existing overhead garage doors & installing 6 office cubicles. revisions are clouded.
-
May 2016
Reroofing.
-
May 2017
Install fire sprinkler throughout bld and underground service maher na.
-
Jul 2017
Ti non structural partition walls, handicap bathroom - equipment installation, structural support. maher na.
-
Sep 2017
Basement, 1/f & 2/f- install sprinkler water flow & elevator recall supervisory system sprinkler permit pp20170601826. t.i permit application 201705307876. maher na.
-
Sep 2017
1/f-tenant improvement - monitor duct detectors for charles chocolates' space per sq ft permit application 201707252838. maher na.
-
Oct 2017
2nd fl - ab-017. remove non-load bearing walls. remove floor topping. n/a for maher.
-
Nov 2017
Prepare hoistway and machine rm for replacement of freight elevator with accessible passenger elevator. no change of occupancy. mechanical, structural, electrical work under sep permit.
-
Dec 2017
2nd floor: ti - new food accessories, upgrade accessibility to existing toilet, renovation of offices new basement storage area, maher na.
-
Mar 2018
Mep work only ref 201712287548. maher na// 7 fsds included// installation of type ii hood within kitchen.
-
Mar 2018
Ref 201712287548 installation of hood support & bracing maher na.
-
Jul 2018
Ti phase 2- monitor mechanical duct det for 4 dampers, 4 ac units and 1 supply fan for permit application 201803052823. 2 smk det and control relay for loading dock roll up door. 1 relay for elevator lobby fire curtain per permit application 201712287548.
-
Aug 2018
Revision to 201712287548 new ptd gyp board pipe chase at 2nd floor per inspectors request maher na.
-
Sep 2018
Evacuation plan and permit. maher n/a.
-
Sep 2018
2nd fl: fire sprinklers: relocate (4) fire sprinklers per tenant improvements.
DBI holds 31 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 31. 1 of them are nominal $1 street-space or sidewalk permits.