2900 18th Street
Mission · San Francisco, CA 94110
-
1924
Built as an industrial building, recorded as occupied by the Independent and Peerless Laundry. Designed by John J. Foley.
-
May 1993
Parapet corrective work.
-
Jun 2010
Convert portion of existing laundry to nursery for growing medical cannabis. work to include new ada entry/ramp at street. interior alteration includes demising wall and new entry doors to space.
-
Sep 2011
Soft demolition in preparation for future permit work. building is vacant and will remain vacant. ab-017. demolition to include: demolition for future ada work future foundation work demolition bathrooms, stairs, topping slab whre needed, plaster ceiling at 2nd floor.
-
Sep 2011
Renovate ofexistingprod facility&accessy office.work to incl new ada entries, ada ramps, adaptexistingfreight elev.to ada elevator, ada bathrms.constr an accessory show room for primary production use. int. partition work @ gr/fl&2/floor.plans to incl area for coffee kiosk on 18th st&voluntary seismic stren.
-
Apr 2012
Signage on 7 awnings.
-
Apr 2012
Double faced electric blade sign.
-
May 2012
Reroofing.
-
Jun 2012
Installation of storage racks with top of commodity not more than 12'-0" from finish floor @264 ln.ft.
-
Jun 2012
Phase i - fire alarm for fully sprinklered building with elevtor recall & shotdown. phase i work includes working in warehouse/loading/shipping, gallery and view court. phases ii & iii will be done under separate applications.
-
Oct 2012
Tenant improvement approx 5830af production space @2nd floor - minor interior alteration, new partition walls, (2) ada bathrooms, all ada accessibility to space provided under ref permit application 2011.0926.5463/s3. separate electrical & plumbing & sprinkler permit will be applied.
-
Apr 2013
Space d -remove concrete floor slab & excavate down approx 5", pour new slab, reconfigure mezz framing, move corridor wall 2ft so. provide new foundation, 5'x8' cut thru concrete wall per walk-thru, new wood framed stair to access second level mezz. replace existing front window, new entries, stairs, ramps.
-
Aug 2013
Remodel of alabama st wing of 550 florida property to include: new partition walls, stairs at existing production space & change of use for space 'a' from production to restaurant shell. all structural work completed under permit application 201109265463. building. fully sprinklers, all ada work, seperate plumbing & electri.
-
Sep 2013
Ti to existing fire sprinkler 61 heads added. ref 2013-0822-4980.
-
Feb 2015
T.i. of approx 5090 sq ft. to include: bread baking facility, commissary kitchen & full service restaurant. (all ada work (bathrooms, path of travel to space under ref permit application 2011/09/20/5060) separate plumbing, electrical & sprinkler permits. building is fully sprinklered. ** maher: yes **.
-
Nov 2015
Add and relocate sprnkler heads in ti ref pa 2015-0209-7862, 5 new and 2 relocated sprinklers. n/a for maher.
-
Dec 2015
T.i. add notification devices in reconfigured walls for tartine bakery.monitor 3 ansul systems, monitor 2 rooftop air units & 2 make up air units duct detectors, and 5 horn/strobesfor permit 201502097862; maher n/a.
-
Apr 2016
New address for pa 2015-0209-7862 for new commercial unit under m623967, revision to 2015-0209-7862 to include: coffee service, service counter, food prep, wine storage area, reconfigure exit stairs. separate plumbing & electrical permits. building fully sprinklered, fire under separate permit. maher na.
-
Oct 2016
Addition of 4 individual unisex toilet rooms and group sink to existing factory/storage. all existing work to facility including ada access to area of work approved pa 2011-0926-5463. life safety deferred. maher ord 155-13 not required.
-
Dec 2016
Minor tenant improvement to existing production space work to include interior partition walls. separate plumbing & electrical. permits/building fully sprinklered; maher n/a.
-
Mar 2017
Change of retail business from existing coffee retail to newstand retail. work to include replacement of millwork. no change use (area of work 250sf) maher na.
-
Jan 2020
Interior t.i. improvement to approx 1450 sq 2nd fl. space withing existing production factory, work to include new ada bathroom, with shower, kitchenete, partition walls and minor structural framing reinforcement associate with new accostical separation floor no change in use. n/a maher.
-
Feb 2025
New operator taking over existing retail sales kiosk. work to include new counter, millwork and equipment. all accessibility including ada path of travel and accessible bathroom accommodattions constructed under previously approved ref permit 201109265463.
-
Apr 2025
Demolish bar, back bar, fixtures and shelves. disconnect and cap all utilities in place. ab-17 soft demolition only.
-
May 2025
Construction of 1 partial height wall. installation of 1 traffic gate. new seating and tables. refinish floor in area of work. legalize the e roll down doors along the alabama st and 18th frontages under planning code section 145.1 d3a to abate envorcement case 2022012702 enf.
DBI holds 58 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 58. 16 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. Submit an update