2929 19th Street
Mission · San Francisco, CA 94110
-
1906
Earlier buildings on the site were destroyed in the earthquake and fire.
-
1923
Built as an industrial building, recorded as occupied by Pelton Water Wheel Co. Engineered by W. W. Hanscom.
-
1956
Storage buildings were added on the Alabama Street side.
-
Oct 1983
Renovation of vacant space.
-
Aug 1993
Replace doors, windows, install wall, floor tile, relocat toilet.
-
Nov 1993
Remodel 2 toilet rooms tile light fixtures and doors.
-
May 1994
Reroofing.
-
Jun 1995
New accessible entrance/replace deteriorated windows.
-
Aug 1998
Replace existing type i hood system with new msf ul hoop.
-
Oct 1998
Parapet.
-
Nov 1998
Upgrade 2nd fl, classrooms, replace doors & frames, new vinyl.
-
Oct 1999
Existing kitchen to be upgraded with new used equpmnt-electrical, plmg.
-
Jul 2000
Construction of new ada entry/lobby on 1st fl. & new walls on 2nd fl.
-
Sep 2000
Add new partitions on 2nd floor as revision to existing permit 200007256086.
-
Oct 2002
Remodel of school dining area on ground floor.
-
Nov 2006
New fire main, 22 new exposure sprinklers, 24 relocated sprinklers, 10 new sprinklers.
-
Dec 2013
Addition of window, glass store front & security roll up doors @ alabama street elevation, demolition of interior non-structural partition walls. remodel partial first floor to new teaching lab. remove mezz in 1st floor.
-
Jul 2014
1)addition of new stair enclosure. no change in occupancy load. 2)addtion of 2 restrooms replacing existing restrooms. 3)new sprinkler heads to existing system under seperate permit. 5) replace five (5) windows street facing-alabama st. n/a for maher ordinance #155-13.
-
Nov 2014
Demolition interior partitions @ mezzanine level, demolition classroom & hall partition @ 1/f., new storage rooms @ 1/f, infill doors @ 2/f., sprinklers on seperate permit. n/a ordinance #155-13.
-
Jun 2015
Exploratory soft demolition to repair water damage to determine extent of leak. not to exceed 300 sq ft. of drywall removal. all fire ratings to be maintained through & post demolition.
-
Jun 2015
Conversion partial 1st floor school staff offices to 2 new classrooms for k to 2nd grade class, teacher preroom & storage. demolition of non-struct.8'-0" high wall (16'-0" ceil'g ht.) per plan. install 2 new accessible restrooms.level landing at front entrace dr under sidewalk encroachment permit.mahr n/a.
-
Aug 2015
Revision to pa 2015-0616-9135 for accessible entrance.
-
Aug 2015
Mechanical work for t.i. appl. #2015.0616.9135. maher n/a.
-
Aug 2015
1st floor" install voice evac system for the e occupancy, phase 1 & 2 pf poa - ref pa 2015 0616 9135 maher na.
-
Mar 2017
To comply with notice of violation #201765521. recommencement and completion of work approved under permit application 201312043351, 201407292461, 201411060853.
-
Aug 2017
Revise existing lighting to comply with t-24 requirements. revision to permit #201312043351. to comply with nov #201765521.
-
Sep 2025
Barrier removal -modernize existing elevator upgrade accessible signage, replace finishes, flooring, paint, paint adjacent lobby.
DBI holds 53 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 53. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect, the early tenants and the date of the last recorded sale. Submit an update