750 Florida Street
Mission · San Francisco, CA 94110
-
1923
Built as a factory and planing mill. Designed by Spencer Mill.
-
Dec 1981
Additions alterations or repairs.
-
Jun 1983
Dock cover.
-
Jun 1984
Alum dock cover 23'2" x 13'6".
-
Aug 1990
Erect a one story warehouse building.
-
1991
The façade was altered.
-
Jan 1991
New building under const. change of foundation design.
-
Mar 1994
Reroofing.
-
Feb 2019
New windows & lighting. upgrade bathrooms. new fence. mep deferred.
-
Jun 2019
Rev to permit application 201902082485; revise ada bathroom layout and remove skylights from building 'a' second floor.
-
Aug 2019
Title 24 compliance: lighting for permit application 201902082485. to comply to complaint 201969702.
-
Mar 2022
Exploratory investigation and selective demolition of existing finishes, lighting, plumbing and heating prior to interior renovation. no structural or egress modifications in the scope. no ceiling work.
-
Apr 2022
Interior only sow: core and shell seismic/structural improvements. accessibility upgrades deferred per ab-017. tenant improvements and change of use under separate application bpa#2022-0607-5743. deferred: m/e/p, fire protection, life safety & frp reinforcement. building fully fire sprinklered per nfpa-13.
-
Jun 2022
Alteration to existing structure including change of use from warehouse to occupancy b-animal care. sow includes: arch, mep & structural modifications not included under phase 1 bpa# 2022-0406-1682. dferred: fire protection, life safety. ** ~encrypt&yes **.
-
Mar 2023
Structural only, beam shear strengthening using fiber polymer reinforcement fir existing 2nd level concrete beams to support e & n structural loads per 202204061682. deferred sprinklers & alarms.
-
Jan 2024
Fire ti: sprinkler relocates - 34. sprinkler adds - 55. changeout existing sprinklers. add new backflow to existing riser assembly. offset existing piping & add restraint/bracing to accomodate ti changes.
-
Mar 2024
Rev to permit application 2022-0607-5743 to (1) omit emergency back up power to elevator (2) modify electrical systems for solar design by new venoder prime electrice, (3) chang fire rating of battery backup room b106 incidental use to be 2hr. work includes architectural and electrical modifications solar deferred.
-
Mar 2024
Rev to permit application 2022-0607-5743 add exterior ships ladder for access to elevator machine room penthouse as required by california state elevator unit. submitted as local equivalency for roof access stair per ab-005. work includes architectural, structural & lighting modifications.
-
Apr 2024
New fire alarm and emergency landing communication system. new fire alarm panel, notification devices throughout in code required areas and new modules for water flow and tamper monitoring. ref permit 202206075743.
-
May 2024
Prop h- installation of photoviltaic(pv) system & the battery energy storage(bess). the 50 kw system will be comprised of (130) 595w q.cell modules, (2) sol-ark inverter, (4) 60kwh sol-ark battery battery.
-
Jul 2025
New pg&e electrical service upgrade to the existing senior dog rescue with new underground transformer fault in the public sidewalk and onsine design build electrical service equipment.
2 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the developer and the early tenants. The assessor dates the building to 1991; the city's 2011 survey of Showplace Square and the northeast Mission dates it to 1923. Submit an update