401–499 Alabama Street
Mission · San Francisco, CA 94110
-
1925
Built as an industrial building, recorded as occupied by American Can Co. offices and machine shops.
-
Nov 1977
Created during job card conversion on: 04/19/84.
-
Nov 1977
Created during job card conversion on: 04/19/84.
-
Jun 1980
Additions alterations or repairs.
-
Aug 1983
Into domestic hot water sourd for residance build a domestic.
-
Aug 1984
Add handicap & exit ramp, toilets & office, etc.
-
Nov 1988
Reroofing.
-
Jun 2000
Street space use.
-
Jul 2002
Acoustic improvements to interior walls between theater & common hallway. replace existing fire doors with a.
-
Feb 2003
Umb seismic retrofit & associated disabled access work. umb retrofit-general procedure-new stairs &.
-
Sep 2004
Reroofing.
-
Dec 2007
Revision to permit application 2003/02/14/7508 to revise umb seismic retrofit, accessibility improvement, entry, path of travel, restrooms, demolish mezzanine in live/work studio 123. mechanical and electrical work under separate permit.
-
Jan 2008
Building# b. renew permit application 2003/02/14/7508.
-
Oct 2008
Revision to 200804210257: add new accessible restroom and shower, extend existing mezzanine in space 122.
-
Apr 2012
New improvement for sculpture studio(lower level) and kitchen/bath/bedroom (upper level). mechanical, electrical and sprinkler and fire alarm work under seperate permit. less than 800 sq ft.
-
Aug 2012
Alteration/remodel bathroom at living area.
-
Sep 2013
Reroofing.
-
May 2015
Reroofing.
-
Aug 2016
3rd fl: interior loft renovation, demolition kitchen, new mezzanine area, new kitchen, remodel bath. n/a for maher. life safety deferred.
-
Nov 2016
One unit: remodel kitchen & bathroom finishes only. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.
-
Nov 2016
Remodel kitchen & bathroom fixtures only, no walls moved/removed/added/infilled. all existing layouts to remain unchanged.
-
Mar 2022
Restoration of windows at four units.
-
Jan 2025
Reroute roof water to 10k gal above ground cistern anchored to new reinforced concrete pad in existing parking lot. extend rainwater piping from interior of theater building to upper floor windows, along face buiding to suport posts along fence and then over to cistern.construction of bioretention planters.
-
Jul 2025
Comply with complaint 202539710. removal of ship ladder (leading to loft storage area) and relocation of 1st floor closet. no structural walls being relocated.
-
May 2026
Barrier removal, bathroom restoration.
DBI holds 256 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 256. 15 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update