540–544 Alabama Street
Mission · San Francisco, CA 94110
Permit history
-
Nov 1991
Bathroom remodel #222.
-
Mar 2002
Install 2 welded steel window units in bricked up locations of prev windows. location is lite indus, un.
-
Apr 2003
Provide handicap bathrooms & ramp. new lighting at bathrooms, mechanical seperate permit.
-
Nov 2003
To add 133 sprinkler heads to the existing sprinkler system to protect lofts constructed with in the un.
-
Jan 2004
Relocate entry doors.
-
Apr 2005
At 1/f wholesale space, provide new doors from street into building., provide newstairs & landing inside.
-
May 2005
Revision to permit application 200504250810.
-
May 2006
Interior alter toexisting2nd & 3rd floor.incl documentation ofexistingunpermitted storage mezz, install fire rated doors, new stairs, ships ladders&guardrails at mezz, structural reinforcement of mezz, fill penetrations+openings at fire rated walls.fire sprinkler wk under sep permit 200311180487.
-
May 2007
Tenant improvement project to include minor interior wall framing repair and replace of drywall (see plans). replace entry door, bathroom remodel to include new tile floor and new fixtures replace laminate floor with new.
-
Feb 2008
Replace windows in kind 7'x7'(aluminum), total of 54, min. u-factor 0.64.
-
Mar 2008
Revision to appl #200605232247: remove existing hollow clay tile walls @ both stairwells @ 2nd & 3rd floors. replace with new 1-hr rated metal stud & gyp bd walls.omit new partition @ 2nd floor north laundry, provide new doors at #312 & relocate door @ #318, repalce glazed opening @ 3rd floor bath with 3/4 hr.rate.
-
Mar 2008
Fire sprinklers: 2nd floor -relocate 7 heads, add 16 new heads, extend piping from existing, repalce existing heads. 3rd floor -relocate 3 heads, add 30 new heads, extend piping from existing, replace existing heads. back door entrance (hallway): replace existing heads.all with quick response.
-
May 2013
To comply with ordinance 029-13 only; installation of grab bars in sro at the following location(s): 3 bathrooms common at 2nd fl & 3 bathrooms at 3rd fl.
-
Jul 2013
Repair stairs landing to warehouse. replace rotting wood. add ramp to facilitate movement in and out of warehouse. significant deterioration(more than 50 %). ramp is for convinience only, wheelchair ramp is in front of the building.
-
Oct 2020
Restore demising walls at 2nd fl guest rooms per original approved permit to provide 46 total guest rooms. walls to be provided at rooms 217, 218, 219, 221, 222, 223 and 224. fire rated doors to be provided between these rooms.
-
Feb 2023
New int partition (non-bearing, non-rated) at one unit. not removing a guest room.
-
May 2025
Upgrading the landline to cell on facp.
5 nominal $1 street-space or sidewalk permits are omitted from the timeline.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update