3100 18th Street
Mission · San Francisco, CA 94110
-
1940
Built as the Southern Pacific Freight Yard office.
-
1970
Additions were built to the side and front.
-
Feb 1981
Additions alterations or repairs.
-
Mar 1982
Additions alterations or repairs.
-
Jun 1984
Add.of warehouse #1 & new warehouse #2 & new parking lot.
-
Jul 1988
Addition of new-offices to warehouse.
-
Dec 1997
Espand existing dining patio area provide accessibility.
-
Oct 2003
Install (cng) compressed natural gas, slow-fill fueling, dispensers, piping, electrical wiring, signages.
-
Jan 2007
Isnatallation of 234 photovoltiaic (pv) modules on the roof, 80 pv mofdules on the upper facade, 72 pv modules oj the lower facade. including 911 electrical equipment, conduit & wiring.
-
Jan 2007
Erect solar carport structure and install its roof 216 photovoltaic modules including all electrical equipement, conduit and wiring to complete this grid tied photovaltaic system. solor system will supply power to exist operations building on this site. attached to e building.
-
Dec 2009
Comply with fire department notice of violation provide second means of egress. partial disabled upgrade at entry. final previously completed work for appl. 9725449 which expired. otain occupant load verification. documentation of work related to 9725449 for partition and windows at dining rm #2.
-
Aug 2013
Remove/replace package a/c units (2) in kind. remove/replace 2 boilers & reconfigure heating hot water piping. nothing will be visable from street.
-
Oct 2013
Voluntery like for like fire alarm system replacement per csfm bulletin dated 9/4/08. no existing plan or ul certified system documentation exisits. fire alarm sound to be heard throughout building.
-
Aug 2014
Install one new split air conditioning system. new fire and smoke dampers at elevator machine room walls. maher n/a.
-
Dec 2014
Voluntary barrier removal to facilities accessed by general public - accessible parking, curb ramp in private parking lot, reception counter, toilet rooms on floors 1, 2 and 3, and signage. maher n/a.
-
Sep 2015
Remove existing non-structural partitions new gyp board partitions. new electrical and mechnical work.
-
Jan 2016
2nd floor: t.i. remove existing non-structural partitions, construct new gyp board, partitions as shown on plan, modify existing acoustical ceiling, separate permit sprinkler, life safety, mechanical & electrical; maher n/a.
-
Mar 2016
T.i. mechanical, minor relocation of grill locations, relocate one sensor (temp), final air balance. electrical, demolition existing electrical equipment, install new ups units, new electrical equipment, new lighting/control, new branch circuiting. 2/f t.i.permit application 201601288211 n/a ordinance #155-13.
-
Apr 2016
Demolition e diesel generator, underslab raceways and conductors. replace with new generator with larger tank (660 gal) and free standing 400kw load bank, new raceways and conductors to new load bank e main switchboard and e automatic switches. no change to existing epss.
-
Sep 2017
T.i.: work includes but is not limited to new flooring and furniture systesm, accessibility upgrades for restrooms and parking lot for code compliance. plumbing, mechanical and electrical work. no mods to the fire protection system in anticipated.
-
Dec 2017
Site securtiy upgrades, replace fence, replace vehicle & personnel access gate & hardware, like-for-like. maher na.
-
Jan 2018
Revision to app#201709158496. t.i. to include changes to finishes at restrooms. new sink and floor drains including mep's. ref app#201709158496. n/a for maher.
-
Feb 2018
2nd floor - restroom refresh - flooring, wall & ceiling finishes. ada upgrade to restrooms. maher na.
-
Feb 2018
3rd floor - restroom refresh - flooring, wall & ceiling finishes. ada upgrade to restrooms. maher na.
-
Nov 2020
Ti of existing restaurant including mirror reconfiguration of existing dish wash area: new dishwasher, 3-com sink, food prep sink, mop sink 7 2 floor sinks. replacement & relocation of rooftop gas hot water heater to g/f. no change to existing cooking, food prep, drink prep, or seating area.
-
Jun 2022
Interior remodel: interior partitions, accessible bath. repair existing windows, replace skylights, roof repair, repair less than 50% existing exterior stair in kind, new finishes.
-
Oct 2022
Provide new type i & type ii exhaust systems. install new rooftop package unit and split system heat pump. install new outdoor air fan and makeup air system. ref arch permit application 202206297382.
DBI holds 45 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 45. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the year the building went up, the architect and builder and the early tenants. Submit an update