3180–3198 18th Street
Mission · San Francisco, CA 94110
-
1902
Built as the Pioneer Trunk Factory. Designed by Thomas Welsh.
-
Jul 1983
8' wall partitions and 12'x13' lounge deck area 8'off floor.
-
Nov 1986
Tenant improvement, demolition partitions, new electrical system.
-
Apr 1989
Tenant improvement work at east wing consist new ceilings.
-
Jul 1990
Cti 1.
-
Jan 1991
Cti-1.
-
Jan 1991
Cti-2.
-
Feb 1991
Cti i.
-
Mar 1991
T/i at ground floor east wing to include gypsum board partit.
-
Apr 1991
Interior alteration at east wing of approx 2900 sq ft.
-
Aug 1991
Tenant improvement.
-
Oct 1994
Install 40 ton chiller on roof.
-
Feb 1995
Revision to 9416530.
-
Mar 2001
Remove some existing partition walls, construct new partition walls, cabinets, alter lighting & plumbing.
-
Sep 2002
Street space.
-
Jul 2011
Office ti on the 1st floor. combine suite 106 and 101 b, minor interior demolition, new partitions, doors, frames relocationof lights, minir electrical. work and case work. mechanical, fire alarm under separate permit.
-
Apr 2012
Interior demolition of non-structural interior partition walls. demolition only per ab-017. t.i. under separate permit.
-
Jun 2012
Interior refurbishment of building corridors, 2nd floor restrooms, & one tenant suite on the 2nd floor. scope includes new-non-rated partitoins, lighting, restroom fixtures, & interior finishes. no structural work, deferred submittals for mechanical, electrical including lighting, fire/life safety).
-
Feb 2013
T.i. on 3 floors including new restrooms, offices, break room, stairs, partitions, casework, closets, dining area. mep, sprinklers under separate permit.
-
Mar 2013
Installation of a new catering prep and storage area in a pre approved location to serve an approved office lunch room.
-
Jun 2013
Tenant improvement inclues new walls, doors, glazing lighting, casework, finishes, and remodel restrooms in kind. mep to be design build under separate permits.
-
Jul 2015
Demolition of existing suites 205 and 207 to connect with suite 200. new partitions, glazing, doors, ceiling, lighting, electrical, and finishes. maher not req.
-
Sep 2015
2nd floor: mep for work done under pa 2015 0729 2815.
-
Apr 2018
Voluntary seismic retrofit of previous retrofit moment frame connections.
-
Nov 2018
Reroofing with modified bitumen roofing, 3-ply, with mechanically attached base sheet.
-
Jan 2022
Replace roof top unit's like for like. replace split system like for like. demolition boiler and primary hot water pump in boiler room. install new boiler skid on roof.
DBI holds 77 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 77. 8 of them are nominal $1 street-space or sidewalk permits.
The survey's data table dates the building to 1902; the context statement's appendix dates it to 1900. Not yet documented: the developer and the early tenants. The assessor dates the building to 1900; the city's 2011 survey of Showplace Square and the northeast Mission dates it to 1902. Submit an update