3175 18th Street
Mission · San Francisco, CA 94110
-
1947
Built as an industrial building, recorded as occupied by Green Glen Dairy.
-
May 1998
Seismic upgrade existingbldg shell improvements & new building core.
-
Oct 1998
Oti-1 el, me 2nd floor.
-
Oct 1998
Oti-2 el, me 2nd floor.
-
Nov 1998
Life safety upgrade.
-
Dec 1998
Oti-1 el, me, 2nd floor.
-
Dec 1998
Oti-2 (2nd fl) mefhanical ducts & zowe controls.
-
Dec 1998
Oti-1 el, me, 2nd floor.
-
Dec 1998
Oti-2 (ast fl) intsall drywall partitions & doors.
-
Dec 1998
Intall stair between 1st & 2nd fl.
-
May 1999
Earthquake retrofit, vertical wall braces, anchor bolts.
-
Sep 1999
Oti-1 1st floor, el, me.
-
Sep 1999
Oti-1 1st floor, el, me.
-
Oct 1999
Revision to permit application 9910494, 9918457, slab addition mezzanine.
-
Apr 2006
Install non structural interior partitions in existing office space.
-
Aug 2008
#201-tenant improvement on partial 1st floor of building, minor wall demolition and construction, rerouting/capping of outlet switches and lighting, casework renovation.
-
Jun 2014
Suite 100 & 200 - renovate non bearing interior partitions. renovate cabinets, appliances in ekitchenettes. electrical under sep permit. no change to building envelope, no change to e wc's or shared corridor.
-
Sep 2015
New lighting and branch circuiting to existing panel.
-
Dec 2016
Interior tenant improvement to include selective demolition, new non load bearing paritions. mep sep permit. occupied by office use in the last 6 month.
-
Feb 2017
Suites 100 & 200: mechanical & electrical work for ti on the 1st and 2nd floor. ref pa 2016-1229-6179.
-
Mar 2017
Replace window with garage door.
-
Mar 2019
T. i. renovate non bearing interior partitions. n/a for maher.
-
Apr 2019
Renovate non bearing interior partition. modify lighting. modify electrical/data. replace one exterior window. 2 new intake/exhaust louvers in existing window frames. no change to shared elevator or shared corridor. modify existing shared wc's to make ada compliant. n/a for maher.
-
Jun 2023
Fire alarm: voluntary system srepalcement & elevator moderation.
-
Jul 2025
Tenant improvement of an existing space. work to include to replace roof top hvac. all exterior work only.
DBI holds 38 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 38. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update