3101–3149 18th Street
Mission · San Francisco, CA 94110
-
Aug 1988
Demolish meeting room.
-
Aug 1988
Demolish storage.
-
Sep 1988
Office building.
-
Sep 1988
Storage.
-
Feb 1989
Install new automatic fire sprinkler in new buildiing.
-
1991
Built as the PG&E Offices and yard.
-
Sep 1999
Oti-1 el, me, l/s.
-
Sep 1999
Oti-2 el, me 1st floor.
-
Feb 2000
Oti 3 1st floor, sp only.
-
Mar 2000
Oti-2 1st floor/sprinkler revision to permit application 2000/02/03/1002.
-
Jul 2020
Pg&e service center ti for conf rm, office, locker rms & 4 break conter, demolition/new non-bearing patitions, modification existing fire sprinkler/alarm system, new flor play lay out, new plumb and electrical, hvac system.
-
Aug 2020
Provide a code compliant ti ball room buildout to an existing fire alarm system.
-
Aug 2020
Add (1) new fire sprinkler, relocate (23) existing sprinklers. plug (7) sprinklers to accomodate renovations.
-
Apr 2021
As built of fire sprinkler permit 2020-0805-1139.
-
Jul 2021
T.i. installing new security wall with access controlled entrance and separate entrance at guard desk, enhancements to pg&e security system.
-
Jul 2023
***priority process*install electric vehicle infrastructure to support 89 charge ports for an existing service yard (no change of use). a total of (25) 19.2kw ac level 2 ports, (20) 22.5kw dc wallbox ports, (4) 92kw dcfc ports and associated electrical equipment will be installed. additionally.
Not yet documented: the year the building went up, the architect and builder, the early tenants and the date of the last recorded sale. Submit an update